Story Transcript
CONTENTS ABOUT SGV WOODEN WORKS >DOORS >CLADDINGS WOODEN WORKS CNC WORKS OUR MACHINES COMPANY DOUCMENTS ORGANIZATIONAL CHART OUR WORKS
ABOUT SGV SAUDI GOLDEN VENEER COMPANY HAS BEEN OPERATING SUCCESSFULLY IN THE KINGDOM FOR THE PAST FOURTY FIVE YEARS. OUR SOURCE OF ACHIEVEMENTS AND SUCCESS ARE SEEN AS THE ULTIMATE RESULT OF STRONG MANAGEMENT AND OUR EFFECTIVE BUSINESS STRATEGIES.
AT SGV, WE STRONGLY BELIEVE IN MANUFACTURING AND MARKETING PRODUCTS THAT BEST MEET CUSTOMER'S REQUIREMENTS AND SATISFACTION. THIS ISMATERIALIZED IN OUR ORGANIZATION THROUGH STRINGENT PRACTICE OF QUALITY ASSURANCE AND A FLEXIBLE CUSTOMER SERVICE EXCELLENCE.
CURRENTLY, SAUDI GOLDEN VENEER COMPANY IS OPERATING IN RIYADH, JEDDAH AND MEKKAH. EVERY BRANCH SHARES OUR UNIFIED VISION AND MISSION OF OUR PRINCIPAL BUSINESS STRATEGIES WHICH IS TO ACHIEVE HIGH QUALITY PRODUCTS AND CUSTOMER SATISFACTION.
WOODEN WORKS : DOORS
THE PROCESS OF MANUFACTURING OUR DOORS GOES THROUGMORE THAN ONE STAGE FIRST, THE MATERIAL MUST BE CHOSEN AS IT IS THE FIRST IMPORTANT POINT THAT MUST BE FOCUSED ON IN THE SPECIFICATIONS OF WOODEN DOORS, AS WELL AS WHEN CHOOSING THE DOOR OF THE HOUSE OR THE DOORS OF THE INTERIOR ROOMS, IT MUST BE CHOSEN WITH CARE AND TTENTION. AFTER A LOT OF RESEARCH AND PREFERENC BETWEEN THE DIFFERENT TYPES, I FOUND VERY MANY TYPES OF WOOD THAT WE USE, MOST OF WHICH ARE IN THE SAUDI FACTORIES OF GOLDEN VENEER, SUCH AS (BEECH - SWEDISH - OAK CHERRY - MAHOGAN -AZIZI WALNUT - TEAK). SEPARATELY FOR THE CUSTOMER WHEN HE CHOOSES ONE OF THEM .
FLUSH DOORS CONSTRUCTION AS FOR THE DOOR FRAME, ALTHOUGH SOME PEOPLE ARE NOT INTERESTED IN IT, BUT IT IS A VERY IMPORTANT ELEMENT IN THE SHAPE AND QUALITY OF THE DOOR. IN ORDER FOR THE DOOR TO BE STRONG AND DURABLE, THE FRAME MUST BE BURIED INSIDE THE FLOOR INSTALLATION CEMENT SOME PEOPLE DO NOT DO THAT, BUT IT CAUSES A LOT OF PROBLEMS BECAUSE IT IS WEAK AND HAS NO BASIS UNDER THE GROUND THE FRAME ITSELF MUST BE AT LEAST 5 CM THICK SO, THAT THE CALONEURON IS INSIDE, AND THIS MEANS THAT IT IS CLOSED SECURELY . AS FOR ITS WIDTH, IT RANGES FROM 15 CM-20 CM. WE MAKE SURE THAT ITS SIZE IS ABOUT 10 CM LONGER THAN THE ROLL WE MAKE A CUT OF 1 CM TO GIVE AN AESTHETIC SHAPE .
GOLDEN VENEER MAKES SURE OF THE SPECIFICATIONS OF THE WOODEN DOORS IN TERMS OF THE CARPENTRY ITSELF, AND THE STRENGTH OF THE SEAMS IN THE WOOD WHETHER THEY WERE CLOSED CORRECTLY OR THERE IS A SPACE BETWEEN THE PANELS AND SOME OF THEM, AND FOR ASSEMBLY, THE LISTS (THE RIGHT AND LEFT VERTICAL WOOD PIECES) ARE ASSEMBLED CORRECTLY WITH THE HEAD (THE HORIZONTAL PIECE OF WOOD ON TOP)AS FOR THE ONE AT THE BOTTOM, IT IS CALLED A BASE, AND THIS IS ONLY FOUND IN WOODEN WINDOWS. WAS IT ASSEMBLED CORRECTLY OR INCORRECTLY, MEANING THAT THE WOODEN TONGUE USED FOR WELDING COMING OUT OF THE WOOD ITSELF IS COMPLETE, AND THIS CLEARLY APPEARS BEFORE THE STAGE OF PAINTING THE DOOR WHILE IT IS IN ITS WOODEN CONDITION
FLUSH DOORS CONSTRUCTION
WOODEN WORKS : CLADDING
GOLDEN VENEER COMPANY ADOPTS A METHOD FOR INSTALLING THE CLAD WEIGHT PROCESS AND APPROPRIATE SIZES FOR CUTTING THE CLADDING, THEN AT A 45-DEGREE WALL FOR THE APPROPRIATE ANGLE IN A V SHAPE AND THE SA COMPLETELY TO ENSURE THE PROCESS OF DISMANTLING AND INSTALLATION FO YEARS INCLUDING THE PROCESS OF PAINTING, MANUFACTURING AND INSTALLA
G
DDING, WHICH IS TO INSTALL A WOODEN OR METAL SUPPORT DIRECTLY ON THE N INSTALL ANOTHER ADDITIONAL SUPPORT 5 CM WIDTH WITH THE LETTER CUT AME SUPPORT IS INSTALLED BEHIND THE CLADDING PIECE AND THEN INSTALLED OR MAINTENANCE WITH A GUARANTEE FOR ALL WORKS FOR A PERIOD OF 5 ATION
CLADDING SYSTEM INSTALLATION
THIS VERTICAL CLADDING FOR FACADES IS A HIGH-DENSITY LAMINATED PANEL, COMPOSED OF A CORE OF PAPER FIBERS -COMPRESSED AT HIGH TEMPERATURE AND PRESSURE- AND AN OUTER COATING HIGHLY RESISTANT TO WEATHERING AND UV RADIATION
THE WOOD USED IN THE PANELS HAS BEEN TREATED , WITHOUT THE NEED FOR MAINTENANCE EXTENDS THE USEFUL LIFE OF THE PANEL AND THE STABILITY OF ITS COLOR REGARDLESS OF WEATHER CONDITIONS
TO GENERATE A VENTILATED FACADE WITH THESE PANELS, EACH UNIT MUST BE INSTALLED ON VERTICAL PROFILES, PRODUCING AN UNINTERRUPTED AIRFLOW BEHIND THE PANEL HERE'S HOW TO DO IT
WOODEN WORKS
WOODEN WORKS
CNC WORK
THE SAUDI GOLDEN VENEER COMPANY WRITES MOVEMENT COMMANDS TO TH WORKPIECE IS ATTACHED), THE MOVEMENT OF THE CUTTING TOOL, THE SPEED OF RO OMMAND IS CALLED THE G-CODE. THE MOVEMENT OF THE TABLE (ON WHICH THE WO OF THE CUTTING TOOL AND SECONDARY COMMANDS SUCH AS CHANGING CUTTING PRESENT IN THIS PROGRAM. THE PROGRAM WILL GIVE COMMANDS SEQUENTIALLY TO OPERATIONS REQUESTED BY THE DESIGNER. TYPING COMMANDS MAKES IT EASY TO P .CREATE VERY COMPLEX 3D .MODELS USING A PRE-MADE PROGRAM
HE MACHINE TO BE EXECUTED LINE BY LINE. THIS CHAIN OF THE TABLE (ON WHICH THE OTATION OFTHE CUTTING TOOL AND SECONDARY COMMANDS SUCH AS CHANGING THE ORKPIECE IS ATTACHED), THE MOVEMENT OF THE CUTTING TOOL, THE SPEED OF ROTATION G TOOL AND TURNING ON AND OFF COOLING, SUCTION AND CLAMPING WILL ALL BE O ALL MOTORS, CONTROLLERS AND MACHINE ACCESSORIES TO CARRY OUT THE PERFORM COMPLEX OPERATIONS USING THE MACHINE. FOR EXAMPLE, YOU CAN
OUR MACHINES
EDGE BANDING
CNC ROUTER MACHINE
NAXING MACHINERY
NAXING MACHINERY THREE ROWS BORING MACHINE
MC BAND SAW MACHINE COMPUTER PANEL SAW
M/C RADIAL ARM / SAW
M/C SURFACE PLANER
OUR MACHINES
WIDEBELT SANDER
M/C SLIDING
M/C SPINDLE MOULDER
TABLE SAW
Badr Contracting Company Ltd | P Date of contract 2021/08/16 | Proj
OUR WORKS
Al Malqa Mosque
Project Name: Almalqua Mosque ject Value: SR828,574
3D DESIGN
REALITY
Al Malqa Mosque The mihrab was executed to the Fullest ac cording to the design, the mihrab pattern was cut with CNC machine This project features daytime renders of a grand mosq ue Located at Riyadh. The scope provided by Badar Contracting and trading Ltd inc luded prayer halls the final design was ach ieved using a modern and innovative appr oach to the traditional Islamic architecture one would find in typical mosques
Dallah Hospital
Dallah Hospital
Midas Construction Project Name: Madeeda Hospitals Project Value : 3.000.000SR
Madeeda Hospital
Madeeda Hospital
ARTLAND General Contracting Project Name: SABB Bank Tower Project Value :1.375,000SR
SABB Bank Tower
SABB Bank Tower
Company Approvals
The following companies have been dealt with 1- ARTLAND General Contracting CO • Project Name: (SABB Tower Project) • Project Value :1.375,000SR • Date of contract : 2021/9/1 • Project status: in progress 2- Hashem Contracting &Trading Corp • Project Name: Renewal of Dallah Hospital Project • Project Value: SR437,811 • Date of contract : 2021/10/16 • Project status: hand over 3- Badr Contracting Company Ltd • Project Name: Almalqua Mosque • Project Value: SR828,574 • Date of contract: 2021/08/16 • Project status: hand over 4- Al Mansouria Oasis Contracting and Maintenance Company • Project Name: Boulevard Project • Project Value :195,861SR • Date of contract: 2021/09/30 • Project status: hand over 5- Midas Construction • Project Name: Madeeda Hospitals • Project Value :3,000.000SR • Date of contract: 2021/12/23 • Project status: in progress
COMPANY DOCUMENTS
ORGANIZATIONAL CHART
30 25 20 15 10 5 0
27
7
3
4
E Sales Design Procurement production Adm Department Department Department Department
De
Staff Numbers
Head of Department
7
3
4
27
Saleem Doss
Maryam Alharbi
Samer Marwan
Waleed Albasha
N
25 18
15 3
Executive ministration epartment
3
Noor Sinno
4
2
4
Financial Department
carpenters
workers
Drivers
Forklift Drivers
Painters
4
25
15
2
4
18
-
-
-
-
Maged Abu alenin Omar Shaghori
THANK YOU