2021 Network Operations Development Plan_Flipbook_Ed1.2 Flipbook PDF

2021 Network Operations Development Plan_Flipbook_Ed1.2

105 downloads 120 Views 9MB Size

Recommend Stories


PROYECTO EDUCATIVO REGIONAL CARAL 2021
Dirección Regional de Educación PROYECTO EDUCATIVO REGIONAL CARAL 2021 Trabajando por una buena educación construimos el desarrollo de nuestra Región

Intel Platform Memory Operations
Intel Platform Memory Operations Disclaimer INTEL DISCLAIMS ALL LIABILITY FOR THESE DEVICES, INCLUDING LIABILITY FOR INFRINGEMENT OF ANY PROPRIETARY R

Intel Platform Memory Operations
Intel Platform Memory Operations Disclaimer INTEL DISCLAIMS ALL LIABILITY FOR THESE DEVICES, INCLUDING LIABILITY FOR INFRINGEMENT OF ANY PROPRIETARY

Intel Platform Memory Operations
Intel Platform Memory Operations Disclaimer INTEL DISCLAIMS ALL LIABILITY FOR THESE DEVICES, INCLUDING LIABILITY FOR INFRINGEMENT OF ANY PROPRIETARY R

Intel Platform Memory Operations
Intel Platform Memory Operations Disclaimer INTEL DISCLAIMS ALL LIABILITY FOR THESE DEVICES, INCLUDING LIABILITY FOR INFRINGEMENT OF ANY PROPRIETARY R

Story Transcript

NETWORK OPERATIONS DEVELOPMENT PLAN 2021

Network Operations Development Plan

System Operations Department December 20, 2021

Contents Introduction

3

1 Substation Proposals 1.1 High Priority Substation Proposals

4 5

1.1.1 Puan Substation 69kV In-Out Breakers

5

1.1.2 Panacan Substation 69kV In-Out Breakers 1.1.3 33 MVA Cabantian Distribution Substation

6 7

2 Lines Proposals 2.1 High Priority Line Proposals

8 10

2.1.1 BAJ 3 Line Extension from BAJ3r_PNR to BAJ3s_MRQ 2.1.2 BUH 2 Line Extension along JP Laurel Avenue

10 11

2.1.3 BUH 4 Line Extension along Santol Street Buhangin

12

2.1.4 BUH 5 Line Extension towards Country Homes Road

13

2.1.5 BUH 5 Line Extension towards Deca Homes and Emily Homes 2.1.6 BUH 7 Line Extension along Communal Road towards Ponte Verde 2.1.7 MAA 2 Line Extension towards Davao Christian CP Garcia Campus 2.1.8 MAA 3 Line Extension along Riverview Road 2.1.9 SVI 2 Line Extension

14 15 16 17 18

2.1.10 SVI 4 Line Upgrade and Extension 2.1.11 TAD 2 Line Extension 2.2 Medium Priority Line Proposals 2.2.1 BUH 1 Line Extension along SP Dacudao Loop 2.2.2 BUH 5 Line Extension along Church Road

19 20 21 21 22

2.2.3 BUH 5 Line Upgrade and Extension at Northcrest Subdivision 2.2.4 BUH 7 (Communal Lateral) and PCN 3 (Ponte Verde Lateral) Upgrade 2.2.5 ECO 4 Line Upgrade and Extension 2.2.6 MAA 2 Line Upgrade from Monteritz Maa to Waan Barangay Hall 2.2.7 MAA 4 Line Upgrade along Country Side Road 2.2.8 MAA 4 Line Extension via Las Palmas Verdes 2.2.9 PRE 7 Earlier Implementation and Extension of Scope

23 24 25 26 27 28 29

2.2.10 PRE 12 Earlier Implementation and Extension of Scope

30

3 Recloser/Sectionalizer Proposal 3.1 2021 Recloser/Sectionalizer Proposals

31 32 1

3.2 2022 Recloser/Sectionalizer Proposals 3.3 2023 Recloser/Sectionalizer Proposals 4 FCI Proposals 4.1 2021 FCI Proposals 4.2 2022 FCI Proposals 4.3 2023 FCI Proposals 4.4 2024 FCI Proposals 4.5 2025 FCI Proposals

36 42 45 46 47 49 50 51

2

Introduction The System Operations Department (SOD) is the guardian of the Davao Light’s electrical and SCADA systems. SOD ensures that the systems are operating under normal conditions, and mitigate the effects of abnormal conditions. Round the clock, SOD operates and monitors Davao Light’s power system, thus having first hand information on its needs and its opportunities for improvement. The Network Operations Development Plan is an initiative that documents the department’s proposals on the following but not limited to: Substation Installations Power Line Upgrade and Extensions Recloser/ Sectionalizer Locations Fault Indicator Locations The proposals listed on this plan will serve as inputs to Power System Planning Department’s Distribution Development Plan and Distribution Network Operations and Maintenance Department’s Reliability and Maintenance Program. The Network Operations Development Plan will be reviewed and updated annually.

3

1

Substation Proposals

Project Name Puan Substation 69kV 1 In-Out Breakers

Purpose

Visualization

48,000,0 00.00

2026

1.1.1

Safety

64,000,0 00.00

2027

1.1.2

Capacity

149,882, 500.00 2025-2027

Driver

- Digos, Davao L1 and Davao L2 Load Transfers Safety

Panacan Substation 69kV - ERA2, ERA 4, DRA 1 and 2 In-Out Breakers DRA 2 Load Transfers 33 MVA Cabantian 3 Distribution Substation

Approx. Cost

DDP Schedule (As of 2020)

- Cabantian, Indangan and Mandug Demand

1.1.3

4

1.1

High Priority Substation Proposals

1.1.1 Puan Substation 69kV In-Out Breakers This facility will aid the load transfers involving Digos Line, Davao Line 1 and Davao Line 3. The Puan substation 69 kV air break switches are frequently operated live during load transfers to lessen the interruptions experienced by our customers. Thus, building the Puan Substation 69 kV In-Out earlier will eradicate the risk exposure of our personnel during live operation of air break switches.

5

1.1.2 Panacan Substation 69kV In-Out Breakers This facility will aid the load transfers involving ERA 2, ERA 4, DRA 1 and DRA 2. The 69 kV air break switches near DPWH Pancan are frequently operated live during load transfers to lessen the interruptions experienced by our customers. Thus, building the Panacan Substation 69 kV In-Out earlier will eradicate the risk exposure of our personnel during live operation of air break switches.

6

1.1.3 33 MVA Cabantian Distribution Substation The progress of Cabantian, Indangan and Mandug areas is significant; this can be observed in the steady increase of the BUH 4 feeder load. It is also important to highlight that the Mindanao Railway project will cut through the aforementioned areas. In case BUH 4 feeder is unavailable, portions of Cabantian, Indangan and Mandug might be unserved because its immediate alternate MAA 4 is already 90% loaded. Or if MAA 4 is unavailable, BUH 4 its immediate alternate cannot accommodate its entire load since BUH 4 is already 85% loaded. Building the new Cabantian Substation earlier will address the increasing demand of Cabantian, Indangan and Mandug areas.

7

2

Lines Proposals

Project Name

Purpose

Driver

Approx. Cost

DDP Schedule Ckt (As of Visualiza Priority Km 2020) tion Level

Deload MAA 4 and BAJ 3 Line Extension Minimize Impact of from BAJ3r_PNR to Flooding at Jade 1 BAJ3s_MRQ Valley

Capacity and Reliability

13,875,818.67 4.50

None

2.1.1

HIGH

BUH 2 Line Extension BAJ 4 (Hospital Line) along JP Laurel Alternate Supply and 2 Avenue Deloading of BAJ 2

Capacity and Reliability

3,083,515.26 1.00

None

2.1.2

HIGH

BUH 4 Line Extension BAJ 4 (Hospital Line) along Santol Street Alternate Supply and 3 Buhangin Deloading of BAJ 3

Capacity and Reliability

3,700,218.31 1.20

None

2.1.3

HIGH

BUH 5 Line Extension towards Country 4 Homes Road BUH 7 Deloading

Capacity and Reliability

3,391,866.79 1.10

None

2.1.4

HIGH

BUH 5 Line Extension towards Deca Homes 5 and Emily Homes BUH 7 Deloading

Capacity and Reliability

1,850,109.16 0.60

None

2.1.5

HIGH

BUH 7 Line Extension along Communal Road towards Ponte 6 Verde BUH 7 Deloading

Capacity

3,083,515.26 1.00

None

2.1.6

HIGH

MAA 2 Line Extension towards Davao Christian CP 7 Garcia Campus

MAA 4 Deloading (For Load Logger) Capacity

820,192.70 0.40

None

2.1.7

HIGH

MAA 3 Line Extension along 8 Riverview Road

Capacity MAA 4 Deloading (For and Load Logger) Reliability

2,775,163.73 0.90

None

2.1.8

HIGH

SVI 3 Deloading

Capacity and Reliability

5,858,678.99 1.90

None

2.1.9

HIGH

SVI 3 Deloading

Capacity and Reliability

3,391,866.79 1.10

None

2.1.10

HIGH

9 SVI 2 Line Extension SVI 4 Line Upgrade 10 and Extension

8

11 TAD 2 Line Extension SVI 3 Deloading

Capacity and Reliability

5,550,327.47 1.80

None

2.1.11

HIGH

BUH 1 Line Extension along SP Dacudao 12 Loop SMX Backup Supply

Reliability

1,541,757.63 0.50

None

2.2.1

MEDIUM

BUH 5 Line Extension 13 along Church Road BUH 5 - BAJ 3 Link

Capacity and Reliability

925,054.58 0.30

None

2.2.2

MEDIUM

BUH 5 Line Upgrade and Extension at North Crest 14 Subdivision

Reliability

462,527.29 0.15

None

2.2.3

MEDIUM

BUH 7 (Communal Lateral) and PCN 3 (Ponte Verde Lateral) BUH 7(BUH 5) link to 15 Upgrade PCN 3 or BUH 8

Reliability

9,558,897.31 3.10

None

2.2.4

MEDIUM

ECO 4 Line Upgrade 16 and Extension

ECO 4 - MAT 3 Link

Reliability

4,625,272.89 1.50

None

2.2.5

MEDIUM

MAA 2 Line Upgrade from Monteritz Maa MAA 2 and MAA 4 17 to Waan Brgy Hall (Mandug) Link

Reliability

13,259,115.62 4.30

None

2.2.6

MEDIUM

MAA 4 Line Upgrade along Countryside Create Backbone Link 18 Road for MAA 4 and MAA 3 Reliability

5,858,678.99 1.90

None

2.2.7

MEDIUM

MAA 4 Line Extension via Las 19 Palmas Verdes

BUH 7 Alternate Supply/ Deloading

MAA 4 - BUH 7 Link

Reliability

4,008,569.84 1.30

None

2.2.8

MEDIUM

PRE 12 Earlier Implementation and Alternate Supply of 20 Extension of Scope RMC Gymnasium

Capacity and Reliability

12,963,775.14 4.00

2023

2.2.9

MEDIUM

Alternate Supply of Davao City Investment and PRE 7 Earlier Tourism Building, Implementation and Pasalubong Center 21 Extension of Scope and People's Park

Capacity and Reliability

4,436,534.34 1.35

2023

2.2.6

MEDIUM

9

2.1

High Priority Line Proposals

2.1.1 BAJ 3 Line Extension from BAJ3r_PNR to BAJ3s_MRQ The BAJ 3 Line Extension along Mandug Road aims to deload MAA 4, one of the top loaded feeders as of October 2021. This will also aid the isolation of the MAA 4 backbone situated in the flood prone areas of Juliville and Jade Valley subdivisions. The proposed line extension will follow the route of the existing MAA 4 along Mandug Road, either through the installation of separate poles or as underbuilt of the existing line depending on the feasibility at site.

10

2.1.2 BUH 2 Line Extension along JP Laurel Avenue The BUH 2 line extension along JP Laurel Avenue will serve as an alternate supply of the critical loads along Dumalas Road, which includes the Southern Philippines Medical Center and the DOH Region XI office (Davao City's main vaccine storage facility). Aside from being a backup supply of our hospital line BAJ 4, this project can also help deload BAJ 2 by assuming part of BAJ 2 loads along JP Laurel Avenue, from SM Lanang to DOH Region XI office.

11

2.1.3 BUH 4 Line Extension along Santol Street Buhangin The BUH 4 line extension along Santol Street, Buhangin will serve as an alternate supply of the critical loads along Dumalas Road, which includes the Southern Philippines Medical Center and the DOH Region XI office (Davao City's main vaccine storage facility). Aside from being a backup supply of our hospital line BAJ 4, this project can also help deload BAJ 3 by assuming BAJ 3 loads near Buhangin flyover.

12

2.1.4 BUH 5 Line Extension towards Country Homes Road The BUH 5 Line Extension along Cabantian Road towards Country Home Road aims to deload BUH 7, one of the top loaded feeders as of October 2021, by assuming the BUH 7 loads under the Cabatian Road lateral.

13

2.1.5 BUH 5 Line Extension towards Deca Homes and Emily Homes The BUH 5 Line Extension along Cabantian Road towards Country Home Road aims to deload BUH 7, one of the top loaded feeders as of October 2021, by assuming the laterals of Deca Homes and Emily homes, existing BUH 7 loads.

14

2.1.6 BUH 7 Line Extension along Communal Road towards Ponte Verde This proposed line extension will link BUH 7 (or BUH 5) and PCN 3/ BUH 8 and will help deload BUH 7.

Note: Communal Lateral will be BUH 5 instead of BUH 7 if 2.1.4 - BUH 5 Line Extension towards Country Homes Road

15

2.1.7 MAA 2 Line Extension towards Davao Christian CP Garcia Campus The MAA 2 Line Extension aims to deload MAA 4, one of the top loaded feeders as of October 2021, by assuming the MAA 4 laterals to Woodridge and Davao Christian C.P. Garcia Campus. This line extension will utilize the existing poles, with MAA 2 as an underbuilt line of the existing MAA 4.

Note: Actual Load of Laterals for Checking

16

2.1.8 MAA 3 Line Extension along Riverview Road The MAA 3 Line Extension along Riverview Road aims to deload MAA 4, one of the top loaded feeders as of October 2021, by assuming the MAA 4 loads under the Countryside Road lateral. This will link MAA 3 and MAA 4.

Note: Actual Load of Lateral for Checking

17

2.1.9 SVI 2 Line Extension The SVI 2 Line Extension from Rivera Medical Center to Sto Niño Elementary School aims to deload SVI 3, one of the top loaded feeders as of October 2021.

18

2.1.10 SVI 4 Line Upgrade and Extension The SVI 4 Line Upgrade and Extension alongBangoy Street aims to deload SVI 3, one of the top loaded feeders as of October 2021, by assuming the SVI 3 lateral along Bangoy Street. In the future, the approximately 1.8 km SVI 3 lateral along Bangoy Street can be upgraded in order to link SVI 3 and SVI 4.

19

2.1.11 TAD 2 Line Extension The TAD 2 Line Extension along Santo Tomas - Carmen road aims to deload SVI 3, one of the top loaded feeders as of October 2021.

20

2.2

Medium Priority Line Proposals

2.2.1 BUH 1 Line Extension along SP Dacudao Loop This proposed line extension will provide SM Lanang Compound, one of the major event centers of Davao City, an alternate supply.

21

2.2.2 BUH 5 Line Extension along Church Road The BUH 5 Line Extension along Church Road aims to link BAJ 3 or BUH 3 and BUH 5.

22

2.2.3 BUH 5 Line Upgrade and Extension at Northcrest Subdivision This proposed line upgrade and extension will link BUH 5 and BUH 7 via Northcrest Subdivision.

23

2.2.4 BUH 7 (Communal Lateral) and PCN 3 (Ponte Verde Lateral) Upgrade The proposed line upgrades of the BUH 7 lateral along Communal Road and the PCN 3 lateral supplying Ponte Verde will link BUH 7 (or BUH 5 if 2.1.4 is materialized) and PCN 3 (or BUH 8 if feeder scope is adjusted).

24

2.2.5 ECO 4 Line Upgrade and Extension This proposed line upgrade and extension will link ECO 4 and MAT 3 via Ecoland Drive.

25

2.2.6 MAA 2 Line Upgrade from Monteritz Maa to Waan Barangay Hall This proposal includes the upgrade of the 4.3 km MAA 2 lateral from Monteritz Maa to Waan Barangay Hall, to link the MAA 2 backbone along C.P. Garcia Highway and the MAA 4 backbone along Mandug Road.

26

2.2.7 MAA 4 Line Upgrade along Country Side Road After the implementation of 2.1.8 MAA 3 Line Extension along Riverview Road, the existing lateral along Countryside Road can be further upgraded to create a reliable link between the MAA 4 backbone along C.P. Garcia Highway and MAA 3 backbone along Eden Street.

27

2.2.8 MAA 4 Line Extension via Las Palmas Verdes This proposed line extension will link MAA4 and BUH 7 via Las Palmas Verdes Mandug.

28

2.2.9 PRE 7 Earlier Implementation and Extension of Scope The original Line New, P. Reyes Feeder 7 project is scheduled for 2023. SOD proposes to implement the project earlier and include the upgrade of the PRE 3 lateral along Jalan Palma Gil Street. Adding 0.35 km to the original project scope will result in the linking of PRE 7 and PRE 3. The lateral along Jalan Palma Gil Street is supplying the following government facilities: Davao City Investment and Tourism Building, Pasalubong Center and People's Park. Cost indicated includes both the original and additional project scope.

29

2.2.10 PRE 12 Earlier Implementation and Extension of Scope The original Line New, P. Reyes Feeder 12 project is scheduled for 2023. SOD proposes to implement the project earlier and include the upgrade of the PRE 4 and GAI2 lateral segments along San Pedro Extension, A. Pichon, Circumferential Road and Lopez Jaena. Adding 0.1.7 km to the original project scope will result in the linking of PRE 4, PRE 12, MAA3 and GAI 2/PRE 8. The segment along Lopez Jaena supplies the RMC Gymnasium, one of the major event centers of Davao City. Cost indicated includes both the original and additional project scope.

30

3

Recloser/Sectionalizer Proposal 2021- 2023 SOD PROPOSAL LINE DEVICES EQUIPMENT

UOM

2021

2022

2023

TOTAL

RECLOSER

UNIT

57

93

50

200

SECTIONALIZER

UNIT

12

9

7

28

69

102

57

228

Total

31

3.1

2021 Recloser/Sectionalizer Proposals

NO

LOCATION

DEVICE TYPE

POLE NUMBER

FEEDER

1

QUIRINO-MAGALLANES INTERSECTION (REPLACE PRE4F_MAG, CUTOUT WITH NO FUSE)

RECLOSER

Nr PN0498414

PRE 4

2

SPMC (BAJ 2 - BAJ 4 LINK, REPLACE CUTOUT)

RECLOSER

0824415

BAJ 4

3

WHITE HOUSE (LOWER)( LINK BAJADA 3-BAJADA 4)

SECTIONALIZER

1562310

BAJ 3

4

CYBERGATE DELTA BAJADA (CONVERT EXISTING BAJ2D_CYB DS)

SECTIONALIZER

0429102

BAJ 2

5

SSS BAJADA (CONVERT EXISTING BAJ4D_SSS DS)

SECTIONALIZER

1795380

BAJ 4

6

NANYO CENTRAL ELEM SCHOOL (SVI 4 - TAD 1 LINK, REPLACEMENT OF BURNED TAD1S_NAN)

RECLOSER

0201842

TAD 1

7

STA5R_COL (COLASAS - UDS) - COLASAS, MAGALLANES CLAVERIA ROTUNDA

RECLOSER

0496430

STA 5

8

JOLLIBEE PANABO (SVI 1 - SVI 2 LINK)

RECLOSER

0222105

SVI 2

9

J.CAMUS EXT./P.TAVERA AND ARELLANO ST CROSSING (GAI2 - PRE 6 LINK)

RECLOSER

0683706

PRE 6

10

MABINI ST. AND ARELLANO ST. CROSSING (PRE 8 PRE6 LINK)

RECLOSER

TBD

PRE 8

11

F. TORRES ST AND MABINI ST. CROSSING (PRE 8 - GAI 2 LINK)

RECLOSER

1100005 (Lower)

PRE 8

12

CAL2R_BAG (CALINAN-BAGUIO) - ALONG ROAD TO MALAGOS, BAGUIO DISTRICT

RECLOSER

0331535

CAL 2

13

SAGINGAN DS

RECLOSER

0474115

TAD 1

14

TIB 4 (LOWER CKT): NEAR LA FILIPINA UY GONGCO CORP

RECLOSER

0146852

TIB 4

15

PCN 2 (LOWER CKT) : IN FRONT OF SHELL NEAR MALAGAMOT ROAD (TOWARDS ILANG)

RECLOSER

0900225

PCN 2

16

REPLACEMENT STAR HOTEL SECTIONALIZER (LINK GAI 2 - PRE 6)

SECTIONALIZER

0643223

GAI 2

17

MAA 3: CITY JAIL DS AT PN 0619943

RECLOSER

0619943

MAA 3

18

MAA 3: CONVENIENCE STORE DS AT PN 0804741

RECLOSER

0804741

MAA 3

19

ECO 2: NEAR FORMER NCCC MALL PARKING AREA

RECLOSER

0441380

ECO 2

20

SHELL MA-A (NR. JOLLIBEE MA-A)

RECLOSER

1689780

MAA 1

21

NEAR SHELL STATION( LINK CALINAN 4-CALINAN 3)

RECLOSER

1692802

CAL 3

22

CONVERT LEA SUBD DS @ PN 1221900 TO

RECLOSER

1221900

BUH 1 - BUH

32

SECTIONALIZER 23

CONVERT NR SS DS @ PN 0511386 TO SECTIONALIZER

24

2 RECLOSER

0511386

BUH 2 - BUH 3

CONVERT SM LANANG DS @ PN 1130823 TO SECTIONALIZER

SECTIONALIZER

1130823

BUH 2 - RCA 1

25

CONVERT DS @ NISSAN PN 0918903 TO SECTIONALIZER

SECTIONALIZER

0918903

GAI 2

26

CONVERT DS @ CHOICEMART PN 0290875 SECTIONALIZER

RECLOSER

0290875

GAI 3 - VIC 1

27

CONVERT DS @ DURIAN HOTEL PN 0358545 SECTIONALIZER

SECTIONALIZER

0358545

VIC 1

28

CONVERT DS @ COCOBOO PN 0430522 SECTIONALIZER

SECTIONALIZER

0430522

VIC 1 - BAJ 6

29

CORNER ACACIA AND CHAMPACA ST.

RECLOSER

0990586

ECO 4

30

PALAN DRIVE DS

RECLOSER

0455745

BUH 1

31

SEVEN ELEVEN CABAGUIO COR VILLAMOR ST.

RECLOSER

0476466

VIC-4-BAJ2

32

ROAD GOING TO CALLAWA (CALLAWA FUSE CUTOUT)

RECLOSER

0090444

MAA 4

33

CORNER N. TORRES ST. AND VILLAMOR ST.

RECLOSER

0774184

VIC 3 - VIC 4 LINK

34

CORNER PORRAS ST. AND VILLAMOR ST.

RECLOSER

1827502

VIC 4

35

CAL2R_WNG (CALINAN - WANGAN) - ROAD GOING TO TAMAYONG, CALINAN

RECLOSER

0417626

CAL 2

36

MERCURY DRUG BANGKEROHAN (UPPER)

RECLOSER

0850746

PRE 5

37

CONVERT SVI2D_CIT DS - SVI 2 AND PBO 1 LINK DS (NEAR CITY HALL)

RECLOSER

0221982

SVI 2

38

CONVERT PBO2D_SEA - NEAR PANABO SEA OIL DS

RECLOSER

0966552

PBO 2

39

MERCURY DRUG CABANTIAN: FIRST POLE AFTER CORNER CABANTIAN ROAD AND COUNTRY HOMES ROAD (TOWARDS INDANGAN)

RECLOSER

TBD

BUH 4

40

FRONTING FORESTLAKE MEMORIAL PARKS GATE

RECLOSER

0591843

ECO 2

41

NEAR SANTIAGO VILLAS, CATALUNAN GRANDE (EXISTING DS TUG3D_SAN)

RECLOSER

1215032

TUG 3

42

NANGKA ST., TUGBOK (EXISTING DS TUG3D_NNG)

RECLOSER

1532246

TUG 3 TAD1 MAA4

43

STANFILCO PANABO - PV SOLAR

RECLOSER

Ref PN 0474701

44

NEAR INDAGAN TERMINAL LATERAL TAPPING POINT (SPLITTER BETWEEN MAA4S_PLV AND BUH4S_CIU

RECLOSER

1193374

33

45

CONVERT PAM2D_LEG (PAM2D_LEG )

RECLOSER

0747340

PAM 2

46

FOTON( LINK PANACAN 1-PAMPANGA 3)

RECLOSER

1621414

PCN 1

47

CONVERT BAJ3D_SAM (SAMULCO BUHANGIN, NEAR OVER-PASS)

RECLOSER

0838882

BAJ 3

48

ECO5S_SGR REPLACEMENT OR REINSTALLATION (NEAR SOUTH GROOVE, QUIMPO BLVD)

SECTIONALIZER

0847160

ECO 5

49

CASA RUBY, MARFORI (PRE6 ISOLATION/SECTIONALIZING)

SECTIONALIZER

0091194 Upper

PRE 6

50

OVERPASS NEAR ALMENDRAS GYM

SECTIONALIZER

0249100

STA 5

51

V. MAPA - J.P. LAUREL JUNCTION (V. MAPA LATERAL)

RECLOSER

0058676

GAI 2

52

V. MAPA - J. CAMUS CROSSING (FOR SECTIONALIZATION OF PRE 8 )

RECLOSER

ref PN: 0685022

PRE 8

53

ABREEZA ENTRANE CAR PARK( LINK BAJADA 1-BAJADA 7)

SECTIONALIZER

1100174 Lower

BAJ 1

54

TALOMO BRIDGE BANDA CANAL( LINK BANGKAL 2-PUAN 3)

RECLOSER

0509916

BKL 2

55

TALOMO BRIDGE BANDA KALSADA( LINK BANGKAL 3-PUAN 1)

RECLOSER

0509916

BKL 3

56

GMALL PARKING EXIT( LINK GAISANO 4-GAISANO 6)

RECLOSER

0402633

GAI 4

57

GAISANO SUBSTATION( LINK GAISANO 4-GAISANO 5)

RECLOSER

0457501

GAI 4

58

NEAR UNIFRUTTI (UPPER CKT)

RECLOSER

0968461

TIB 2

59

69 KV POLE IN BETWEEN HOLCIM BRIDGE AND ILANG OVERPASS (UPPER CKT)

RECLOSER

1195655

TIB 2

60

INFRONT MOSQUE (UPPER CKT)

RECLOSER

0963513

TIB 2

61

HANNIE'S INN ( LINK PUAN 1-PUAN 3)

RECLOSER

0291990

PUA 1

62

LOWER CIRCUIT, ALONG H-WAY BAGO APLAYA( LINK PUAN 2-PUAN 3)

RECLOSER

0518782

PUA 2

63

APO GULF (CARWASH)( LINK PUAN 2-PUAN 3)

RECLOSER

0781040

PUA 2

64

AUB( LINK R.CASTILLO 3-VICTORIA 3)

RECLOSER

0638206

RCA 3

65

AGDAO FLYOVER( LINK R.CASTILLO 3-BAJADA 2)

RECLOSER

0779161

RCA 3

66

GENERICA( LINK SAN VICENTE 1-SAN VICENTE 4)

RECLOSER

0989060

SVI 1

67

CONVERT MAA4F_IND (INDANGAN NEAR BRGY HALL FUSE CUT-OUT)

RECLOSER

0347065

MAA 4

68

New DS at PN1939750 (BUH 5 - BUH 7 Link) Near Jehovah Kingdom Hall

RECLOSER

1939750

BUH 7

34

69

RMC Lateral with Bypassed cutout

RECLOSER

0648696

PRE 8

35

3.2

2022 Recloser/Sectionalizer Proposals

NO

LOCATION

DEVICE TYPE

POLE NUMBER

FEEDER

RECLOSER

0787755

SVI 2

FRONTING SS CARWASH( LINK SAN VICENTE 2-SAN 1

VICENTE 5) SANTOL STREET (BUH 4 LATERAL / BACKBONE FROM

2

DIVERSION ROAD)

TBA see this RECLOSER

ALONG DUMANLAS ROAD, FRONTING SPMC (BAJ 4 3

BUH 4 LINK)

Street View

BUH 4

TBA see this SECTIONALIZER

Street View

BAJ 4

TBA see this 4

ALONG JP LAUREL, NEAR CARMELITE CHURCH

RECLOSER

ALONG JP LAUREL, INFRONT DOH - BLOOD BANK 5

(BAJ 4 - BUH 4 LINK)

Street View

BUH 2

TBA see this SECTIONALIZER

Street View

BAJ 4

RECLOSER

1756490

PRE 8

RECLOSER

0696715

GAI 2

COVERT DS AT CAFE TAVERA GAI2D_TAV F.TORRES - J. CAMUS CROSSING (FOR 6

SECTIONALIZATION OF PRE 8 ) JP LAUREL - TORRES X'NG (TO SERVE AS PRE 8 - GAI 2

7

LINK) STA ANA AVE - L.GUERRERO CROSSING (GAI 4 - PRE 9 LINK)

8

CONVERT GAI4D_ALA - ALABASTRO

PN 0498856 RECLOSER

NEAR RAMON MAGSAYSAY AVE - SUAZO ST 9

CROSSING (PRE 9 - PRE 2 LINK)

(UPPER)

PRE 9

ref PN: RECLOSER

0849745

PRE 9

ref PN: 10

F.TORRES - EMILIO JACINTO EXT. (PRE 10 - VIC 2 LINK)

RECLOSER

8007572

V.MAPA - EMILIO JACINTO EXT. CROSSING (PRE 10 -

PRE 10

ref PN:

11

GAI 2 LINK)

RECLOSER

0854655

PRE 10

12

ORANGE GROOVE HOTEL (BUH 4 - BAJ 3 LINK)

RECLOSER

2015572

BUH 4

13

SUMIFRU( LINK TIBUNGCO 2-TIBUNGCO 4)

SECTIONALIZER

0944253

TIB 2

14

CASA RUBY, MARFORI (MAA 3 - GAI 2 LINK)

SECTIONALIZER

Lower

MAA 3

1100044 -

ALONG PALMA GIL ST; PRE3 LATERAL SUPPLYING 15

P-PARK

RECLOSER

0989866

PRE 3

16

ALONG PELAYO ST; LATERAL OF PRE4

RECLOSER

0498315

PRE 4

17

BUNAWAN SS( LINK BUNAWAN 2-TIBUNGCO 3)

RECLOSER

0836265

BUN 2

36

NEAR CALINAN SUBSTATION - FACING BUDA ( LINK 18

CALINAN 1-CALINAN 2)

RECLOSER

0806962

CAL 1

INFRONT CALINAN SUBSTATION( LINK CALINAN 19

1-CALINAN 3)

RECLOSER

0384434

CAL 1

20

MOTOLITE DS( LINK CALINAN 2-CALINAN 3)

RECLOSER

0594812

CAL 2

RECLOSER

0538220

CAL 3

SECTIONALIZER

0068480

MAT 1

RECLOSER

0937723

STO 2

SECTIONALIZER

0683631

PRE 4

SECTIONALIZER

0683631

PRE 5

RECLOSER

TBA

TUG 1

RECLOSER

0674005

CAL 2

RECLOSER

0294532

CAL 3

NEAR BARON CARWASH( LINK CALINAN 3 - CALINAN 21

4)

22

CAIEM COCO LUMBER( LINK MATINA 1-MATINA 2)

23

NEAR STO2 AVR( LINK STO. TOMAS 2-STO TOMAS 3) ALONG ELPIDIO QUIRINO AVENUE NEAR DAVAO

24

DOCTORS HOSPITAL (DDH SIDE) ALONG ELPIDIO QUIRINO AVENUE NEAR DAVAO

25

DOCTORS HOSPITAL (SANTOS BUILDING 2 SIDE) MINTAL HFRAME BESIDE BDO NETWORK BANK

26

(HFRAME OCB UNIT - TO PLANT2) NEAR CALINAN ELEM SCHOOL (EXISTING DS,

27

CAL2D_CES) CALINAN NAT'L HIGHWAY, PALAYAN (EXISTING DS,

28

CAL3D_PAL) BESIDE ANSUICO BUILDING AND IN FRONT DPWH, PANACAN, DAVAO CITY (INTERCONNECTION

29

BETWEEN PCN04 AND PCN05)

RECLOSER

1684855

PCN05

30

ARELLANO COR MABINI

RECLOSER

0684464

BAJ9/PRE6

31

BONIFACIO COR PONCIANO

RECLOSER

1150263

PRE3

32

MATINA SANDAWA

RECLOSER

0592463

PRE5

33

QUIRINO

RECLOSER

0985395

PRE 4

34

NEAR DCCC

RECLOSER

1214040

TIB04

35

NEAR SHELL

RECLOSER

2111985

TIB04

RECLOSER

0595463

TUG 1

RECLOSER

1830823

TUG 4

RECLOSER

0203184

TUG 4

NEAR DACUDAO TUGBOK MAUSOLEUM (EXISTING 36

DS, TUG1D_NDM) NEAR ANGALAN BRIDGE 1 (EXISTING DS,

37

TUG4D_ABR1) NEAR ANGALAN BRIDGE 3 (EXISTING DS,

38

TUG4D_ABR3)

37

CONVERT MAA4F_PAL (PALOS VERDES FUSE 39

CUT-OUT)

RECLOSER

0090436

MAA 4

RECLOSER

2015672

BUH 4

RECLOSER

0378266

BUN 4

RECLOSER

0899462

PCN 1

RECLOSER

0691510

PBO 2

ORANGE GROVE HOTEL, BUHANGIN (LINK BETWEEN 40

BAJ03 AND NEW BUH04) CONVERT BUN4D_MAH (CORNER MAHAYAG, PART

41

OF NEW BUN 4) DPWH/ FRONTING PETRON( LINK PANACAN

42

1-PAMPANGA 3) INFRONT PANABO SUBSTATION (LATERAL LINE, REPLACEMENT OF EXISTING CUTOUT FUSE

43

PROTECTION) CONVERT RCA3D_HER (HERZY CARWASH,

44

R.CASTILLO ST.)

RECLOSER

0555383

RCA 3

45

STO TOMAS, MARSCON GYMNASIUM

RECLOSER

2339360

STA 2

46

CONVERT BKL2D_MBR (NEAR MINTAL BRIDGE)

RECLOSER

1534254

TUG 3

47

CONVERT TUG1D_FSS (FRONT SASEDOR SHOP)

RECLOSER

0667035

TUG 3

48

N.TORRES COR. LOYOLA OBRERO

RECLOSER

0695905

VIC 3

49

BAJADA FRONTING V.PLAZA MALL

RECLOSER

0394854

VIC 1

RECLOSER

Inside SS

CAL 3

INSIDE CAL SS - BYPASS DS FOR CAL 3 (33 MVA & 10 50

MVA) NEAR DBCOM ENTRANCE( LINK PANACAN

51

4-TIBUNGCO 2)

SECTIONALIZER

0900324

PCN 4

52

CONVERT PCN1D_BUL (DS BULALOAN, NEAR DPWH)

SECTIONALIZER

0121675

PCN 1

53

FRONTING FORESTLAKE MEMORIAL PARKS GATE

RECLOSER

0591843

ECO 2

RECLOSER

0290092

BAJ 6 / VIC 1

RECLOSER

TBD

CAL 3

RECLOSER

TBD

CAL 3

RECLOSER

0806452

MAA 4

RECLOSER

0456920

PCN 1

CONVERT BAJ6D_FFX 54

FARM FIX, DIVERSION DEVICE 1 BETWEEN CAL3R_LAC (LACSON RECLOSER)

55

AND CAL3R_GUM (GUMALANG RECLOSER) DEVICE 2 BETWEEN CAL3R_LAC (LACSON RECLOSER)

56

AND CAL3R_GUM (GUMALANG RECLOSER) PILAR P. RODRIGUEZ ELEMENTARY SCHOOL,TIGATTO, BUHANGIN, DAVAO CITY, DAVAO DEL SUR,

57

PHILIPPINES

58

CONVERT PCN1D_1L2

38

MABUHAY EMISSION TEST( LINK PANACAN 1-PANACAN 2) CONVERT PCN4D_COO 59

AGDAO COOP, PANACAN

RECLOSER

REPLACE DEFECTIVE TBO4S_ILA 60

ILANG OVERPASS SECTIONALIZER

1172593 RECLOSER

(LOWER)

RECLOSER

(ROAD SIDE)

CONVERT TIB1D_BES 61

BUHISAN ELEM (ROAD SIDE)

0242383

CONVERT TIB1D_A1 62

NEAR A1

0797483

RECLOSER

PCN 4

TIB 4

TIB 3

0927540

TIB 1

0903660

BUN 1

BUN1R_DRA REPLACEMENT (POLE AFFECTED BY ROAD WIDENING; ONLINE BUT CAN'T BE ACCESSED BY SCADA; CONTROL BOX 63

OBSERVED TO HAVE DENTS DUE TO COLLISION)

RECLOSER

64

JADE VALLEY FREQUENTLY FLOODED LATERAL 1

RECLOSER

TBD

MAA 4

65

JADE VALLEY FREQUENTLY FLOODED LATERAL 2

RECLOSER

TBD

MAA 4

66

JADE VALLEY FREQUENTLY FLOODED LATERAL 3

RECLOSER

TBD

MAA 4

TBD

VIC 1

TBD

VIC 1

PHASE 5 EL RIO SUBDIVISION FREQUENTLY FLOODED 67

LATERAL 1

RECLOSER

PHASE 5 EL RIO SUBDIVISION FREQUENTLY FLOODED 68

LATERAL 2

RECLOSER

Ref PN0983112 69

PREYES 1 ISOLATION POINTS OUTSIDE SS

RECLOSER

- Upper Ref PN0983112

70

PREYES 3 ISOLATION POINTS OUTSIDE SS

RECLOSER

- Lower Ref PN0882620

71

PREYES 4 ISOLATION POINTS OUTSIDE SS

RECLOSER

- Facing DepEd

PRE 1

PRE 3

PRE 4

Ref PN0882620 - Facing

PRE 5

72

PREYES 5 ISOLATION POINTS OUTSIDE SS

RECLOSER

Canteen

73

PREYES 6 ISOLATION POINTS OUTSIDE SS

RECLOSER

Ref PN0456966

PRE 6

Ref PN0456966

PRE 8

PREYES 8 ISOLATION POINTS OUTSIDE SS 74