Story Transcript
NETWORK OPERATIONS DEVELOPMENT PLAN 2021
Network Operations Development Plan
System Operations Department December 20, 2021
Contents Introduction
3
1 Substation Proposals 1.1 High Priority Substation Proposals
4 5
1.1.1 Puan Substation 69kV In-Out Breakers
5
1.1.2 Panacan Substation 69kV In-Out Breakers 1.1.3 33 MVA Cabantian Distribution Substation
6 7
2 Lines Proposals 2.1 High Priority Line Proposals
8 10
2.1.1 BAJ 3 Line Extension from BAJ3r_PNR to BAJ3s_MRQ 2.1.2 BUH 2 Line Extension along JP Laurel Avenue
10 11
2.1.3 BUH 4 Line Extension along Santol Street Buhangin
12
2.1.4 BUH 5 Line Extension towards Country Homes Road
13
2.1.5 BUH 5 Line Extension towards Deca Homes and Emily Homes 2.1.6 BUH 7 Line Extension along Communal Road towards Ponte Verde 2.1.7 MAA 2 Line Extension towards Davao Christian CP Garcia Campus 2.1.8 MAA 3 Line Extension along Riverview Road 2.1.9 SVI 2 Line Extension
14 15 16 17 18
2.1.10 SVI 4 Line Upgrade and Extension 2.1.11 TAD 2 Line Extension 2.2 Medium Priority Line Proposals 2.2.1 BUH 1 Line Extension along SP Dacudao Loop 2.2.2 BUH 5 Line Extension along Church Road
19 20 21 21 22
2.2.3 BUH 5 Line Upgrade and Extension at Northcrest Subdivision 2.2.4 BUH 7 (Communal Lateral) and PCN 3 (Ponte Verde Lateral) Upgrade 2.2.5 ECO 4 Line Upgrade and Extension 2.2.6 MAA 2 Line Upgrade from Monteritz Maa to Waan Barangay Hall 2.2.7 MAA 4 Line Upgrade along Country Side Road 2.2.8 MAA 4 Line Extension via Las Palmas Verdes 2.2.9 PRE 7 Earlier Implementation and Extension of Scope
23 24 25 26 27 28 29
2.2.10 PRE 12 Earlier Implementation and Extension of Scope
30
3 Recloser/Sectionalizer Proposal 3.1 2021 Recloser/Sectionalizer Proposals
31 32 1
3.2 2022 Recloser/Sectionalizer Proposals 3.3 2023 Recloser/Sectionalizer Proposals 4 FCI Proposals 4.1 2021 FCI Proposals 4.2 2022 FCI Proposals 4.3 2023 FCI Proposals 4.4 2024 FCI Proposals 4.5 2025 FCI Proposals
36 42 45 46 47 49 50 51
2
Introduction The System Operations Department (SOD) is the guardian of the Davao Light’s electrical and SCADA systems. SOD ensures that the systems are operating under normal conditions, and mitigate the effects of abnormal conditions. Round the clock, SOD operates and monitors Davao Light’s power system, thus having first hand information on its needs and its opportunities for improvement. The Network Operations Development Plan is an initiative that documents the department’s proposals on the following but not limited to: Substation Installations Power Line Upgrade and Extensions Recloser/ Sectionalizer Locations Fault Indicator Locations The proposals listed on this plan will serve as inputs to Power System Planning Department’s Distribution Development Plan and Distribution Network Operations and Maintenance Department’s Reliability and Maintenance Program. The Network Operations Development Plan will be reviewed and updated annually.
3
1
Substation Proposals
Project Name Puan Substation 69kV 1 In-Out Breakers
Purpose
Visualization
48,000,0 00.00
2026
1.1.1
Safety
64,000,0 00.00
2027
1.1.2
Capacity
149,882, 500.00 2025-2027
Driver
- Digos, Davao L1 and Davao L2 Load Transfers Safety
Panacan Substation 69kV - ERA2, ERA 4, DRA 1 and 2 In-Out Breakers DRA 2 Load Transfers 33 MVA Cabantian 3 Distribution Substation
Approx. Cost
DDP Schedule (As of 2020)
- Cabantian, Indangan and Mandug Demand
1.1.3
4
1.1
High Priority Substation Proposals
1.1.1 Puan Substation 69kV In-Out Breakers This facility will aid the load transfers involving Digos Line, Davao Line 1 and Davao Line 3. The Puan substation 69 kV air break switches are frequently operated live during load transfers to lessen the interruptions experienced by our customers. Thus, building the Puan Substation 69 kV In-Out earlier will eradicate the risk exposure of our personnel during live operation of air break switches.
5
1.1.2 Panacan Substation 69kV In-Out Breakers This facility will aid the load transfers involving ERA 2, ERA 4, DRA 1 and DRA 2. The 69 kV air break switches near DPWH Pancan are frequently operated live during load transfers to lessen the interruptions experienced by our customers. Thus, building the Panacan Substation 69 kV In-Out earlier will eradicate the risk exposure of our personnel during live operation of air break switches.
6
1.1.3 33 MVA Cabantian Distribution Substation The progress of Cabantian, Indangan and Mandug areas is significant; this can be observed in the steady increase of the BUH 4 feeder load. It is also important to highlight that the Mindanao Railway project will cut through the aforementioned areas. In case BUH 4 feeder is unavailable, portions of Cabantian, Indangan and Mandug might be unserved because its immediate alternate MAA 4 is already 90% loaded. Or if MAA 4 is unavailable, BUH 4 its immediate alternate cannot accommodate its entire load since BUH 4 is already 85% loaded. Building the new Cabantian Substation earlier will address the increasing demand of Cabantian, Indangan and Mandug areas.
7
2
Lines Proposals
Project Name
Purpose
Driver
Approx. Cost
DDP Schedule Ckt (As of Visualiza Priority Km 2020) tion Level
Deload MAA 4 and BAJ 3 Line Extension Minimize Impact of from BAJ3r_PNR to Flooding at Jade 1 BAJ3s_MRQ Valley
Capacity and Reliability
13,875,818.67 4.50
None
2.1.1
HIGH
BUH 2 Line Extension BAJ 4 (Hospital Line) along JP Laurel Alternate Supply and 2 Avenue Deloading of BAJ 2
Capacity and Reliability
3,083,515.26 1.00
None
2.1.2
HIGH
BUH 4 Line Extension BAJ 4 (Hospital Line) along Santol Street Alternate Supply and 3 Buhangin Deloading of BAJ 3
Capacity and Reliability
3,700,218.31 1.20
None
2.1.3
HIGH
BUH 5 Line Extension towards Country 4 Homes Road BUH 7 Deloading
Capacity and Reliability
3,391,866.79 1.10
None
2.1.4
HIGH
BUH 5 Line Extension towards Deca Homes 5 and Emily Homes BUH 7 Deloading
Capacity and Reliability
1,850,109.16 0.60
None
2.1.5
HIGH
BUH 7 Line Extension along Communal Road towards Ponte 6 Verde BUH 7 Deloading
Capacity
3,083,515.26 1.00
None
2.1.6
HIGH
MAA 2 Line Extension towards Davao Christian CP 7 Garcia Campus
MAA 4 Deloading (For Load Logger) Capacity
820,192.70 0.40
None
2.1.7
HIGH
MAA 3 Line Extension along 8 Riverview Road
Capacity MAA 4 Deloading (For and Load Logger) Reliability
2,775,163.73 0.90
None
2.1.8
HIGH
SVI 3 Deloading
Capacity and Reliability
5,858,678.99 1.90
None
2.1.9
HIGH
SVI 3 Deloading
Capacity and Reliability
3,391,866.79 1.10
None
2.1.10
HIGH
9 SVI 2 Line Extension SVI 4 Line Upgrade 10 and Extension
8
11 TAD 2 Line Extension SVI 3 Deloading
Capacity and Reliability
5,550,327.47 1.80
None
2.1.11
HIGH
BUH 1 Line Extension along SP Dacudao 12 Loop SMX Backup Supply
Reliability
1,541,757.63 0.50
None
2.2.1
MEDIUM
BUH 5 Line Extension 13 along Church Road BUH 5 - BAJ 3 Link
Capacity and Reliability
925,054.58 0.30
None
2.2.2
MEDIUM
BUH 5 Line Upgrade and Extension at North Crest 14 Subdivision
Reliability
462,527.29 0.15
None
2.2.3
MEDIUM
BUH 7 (Communal Lateral) and PCN 3 (Ponte Verde Lateral) BUH 7(BUH 5) link to 15 Upgrade PCN 3 or BUH 8
Reliability
9,558,897.31 3.10
None
2.2.4
MEDIUM
ECO 4 Line Upgrade 16 and Extension
ECO 4 - MAT 3 Link
Reliability
4,625,272.89 1.50
None
2.2.5
MEDIUM
MAA 2 Line Upgrade from Monteritz Maa MAA 2 and MAA 4 17 to Waan Brgy Hall (Mandug) Link
Reliability
13,259,115.62 4.30
None
2.2.6
MEDIUM
MAA 4 Line Upgrade along Countryside Create Backbone Link 18 Road for MAA 4 and MAA 3 Reliability
5,858,678.99 1.90
None
2.2.7
MEDIUM
MAA 4 Line Extension via Las 19 Palmas Verdes
BUH 7 Alternate Supply/ Deloading
MAA 4 - BUH 7 Link
Reliability
4,008,569.84 1.30
None
2.2.8
MEDIUM
PRE 12 Earlier Implementation and Alternate Supply of 20 Extension of Scope RMC Gymnasium
Capacity and Reliability
12,963,775.14 4.00
2023
2.2.9
MEDIUM
Alternate Supply of Davao City Investment and PRE 7 Earlier Tourism Building, Implementation and Pasalubong Center 21 Extension of Scope and People's Park
Capacity and Reliability
4,436,534.34 1.35
2023
2.2.6
MEDIUM
9
2.1
High Priority Line Proposals
2.1.1 BAJ 3 Line Extension from BAJ3r_PNR to BAJ3s_MRQ The BAJ 3 Line Extension along Mandug Road aims to deload MAA 4, one of the top loaded feeders as of October 2021. This will also aid the isolation of the MAA 4 backbone situated in the flood prone areas of Juliville and Jade Valley subdivisions. The proposed line extension will follow the route of the existing MAA 4 along Mandug Road, either through the installation of separate poles or as underbuilt of the existing line depending on the feasibility at site.
10
2.1.2 BUH 2 Line Extension along JP Laurel Avenue The BUH 2 line extension along JP Laurel Avenue will serve as an alternate supply of the critical loads along Dumalas Road, which includes the Southern Philippines Medical Center and the DOH Region XI office (Davao City's main vaccine storage facility). Aside from being a backup supply of our hospital line BAJ 4, this project can also help deload BAJ 2 by assuming part of BAJ 2 loads along JP Laurel Avenue, from SM Lanang to DOH Region XI office.
11
2.1.3 BUH 4 Line Extension along Santol Street Buhangin The BUH 4 line extension along Santol Street, Buhangin will serve as an alternate supply of the critical loads along Dumalas Road, which includes the Southern Philippines Medical Center and the DOH Region XI office (Davao City's main vaccine storage facility). Aside from being a backup supply of our hospital line BAJ 4, this project can also help deload BAJ 3 by assuming BAJ 3 loads near Buhangin flyover.
12
2.1.4 BUH 5 Line Extension towards Country Homes Road The BUH 5 Line Extension along Cabantian Road towards Country Home Road aims to deload BUH 7, one of the top loaded feeders as of October 2021, by assuming the BUH 7 loads under the Cabatian Road lateral.
13
2.1.5 BUH 5 Line Extension towards Deca Homes and Emily Homes The BUH 5 Line Extension along Cabantian Road towards Country Home Road aims to deload BUH 7, one of the top loaded feeders as of October 2021, by assuming the laterals of Deca Homes and Emily homes, existing BUH 7 loads.
14
2.1.6 BUH 7 Line Extension along Communal Road towards Ponte Verde This proposed line extension will link BUH 7 (or BUH 5) and PCN 3/ BUH 8 and will help deload BUH 7.
Note: Communal Lateral will be BUH 5 instead of BUH 7 if 2.1.4 - BUH 5 Line Extension towards Country Homes Road
15
2.1.7 MAA 2 Line Extension towards Davao Christian CP Garcia Campus The MAA 2 Line Extension aims to deload MAA 4, one of the top loaded feeders as of October 2021, by assuming the MAA 4 laterals to Woodridge and Davao Christian C.P. Garcia Campus. This line extension will utilize the existing poles, with MAA 2 as an underbuilt line of the existing MAA 4.
Note: Actual Load of Laterals for Checking
16
2.1.8 MAA 3 Line Extension along Riverview Road The MAA 3 Line Extension along Riverview Road aims to deload MAA 4, one of the top loaded feeders as of October 2021, by assuming the MAA 4 loads under the Countryside Road lateral. This will link MAA 3 and MAA 4.
Note: Actual Load of Lateral for Checking
17
2.1.9 SVI 2 Line Extension The SVI 2 Line Extension from Rivera Medical Center to Sto Niño Elementary School aims to deload SVI 3, one of the top loaded feeders as of October 2021.
18
2.1.10 SVI 4 Line Upgrade and Extension The SVI 4 Line Upgrade and Extension alongBangoy Street aims to deload SVI 3, one of the top loaded feeders as of October 2021, by assuming the SVI 3 lateral along Bangoy Street. In the future, the approximately 1.8 km SVI 3 lateral along Bangoy Street can be upgraded in order to link SVI 3 and SVI 4.
19
2.1.11 TAD 2 Line Extension The TAD 2 Line Extension along Santo Tomas - Carmen road aims to deload SVI 3, one of the top loaded feeders as of October 2021.
20
2.2
Medium Priority Line Proposals
2.2.1 BUH 1 Line Extension along SP Dacudao Loop This proposed line extension will provide SM Lanang Compound, one of the major event centers of Davao City, an alternate supply.
21
2.2.2 BUH 5 Line Extension along Church Road The BUH 5 Line Extension along Church Road aims to link BAJ 3 or BUH 3 and BUH 5.
22
2.2.3 BUH 5 Line Upgrade and Extension at Northcrest Subdivision This proposed line upgrade and extension will link BUH 5 and BUH 7 via Northcrest Subdivision.
23
2.2.4 BUH 7 (Communal Lateral) and PCN 3 (Ponte Verde Lateral) Upgrade The proposed line upgrades of the BUH 7 lateral along Communal Road and the PCN 3 lateral supplying Ponte Verde will link BUH 7 (or BUH 5 if 2.1.4 is materialized) and PCN 3 (or BUH 8 if feeder scope is adjusted).
24
2.2.5 ECO 4 Line Upgrade and Extension This proposed line upgrade and extension will link ECO 4 and MAT 3 via Ecoland Drive.
25
2.2.6 MAA 2 Line Upgrade from Monteritz Maa to Waan Barangay Hall This proposal includes the upgrade of the 4.3 km MAA 2 lateral from Monteritz Maa to Waan Barangay Hall, to link the MAA 2 backbone along C.P. Garcia Highway and the MAA 4 backbone along Mandug Road.
26
2.2.7 MAA 4 Line Upgrade along Country Side Road After the implementation of 2.1.8 MAA 3 Line Extension along Riverview Road, the existing lateral along Countryside Road can be further upgraded to create a reliable link between the MAA 4 backbone along C.P. Garcia Highway and MAA 3 backbone along Eden Street.
27
2.2.8 MAA 4 Line Extension via Las Palmas Verdes This proposed line extension will link MAA4 and BUH 7 via Las Palmas Verdes Mandug.
28
2.2.9 PRE 7 Earlier Implementation and Extension of Scope The original Line New, P. Reyes Feeder 7 project is scheduled for 2023. SOD proposes to implement the project earlier and include the upgrade of the PRE 3 lateral along Jalan Palma Gil Street. Adding 0.35 km to the original project scope will result in the linking of PRE 7 and PRE 3. The lateral along Jalan Palma Gil Street is supplying the following government facilities: Davao City Investment and Tourism Building, Pasalubong Center and People's Park. Cost indicated includes both the original and additional project scope.
29
2.2.10 PRE 12 Earlier Implementation and Extension of Scope The original Line New, P. Reyes Feeder 12 project is scheduled for 2023. SOD proposes to implement the project earlier and include the upgrade of the PRE 4 and GAI2 lateral segments along San Pedro Extension, A. Pichon, Circumferential Road and Lopez Jaena. Adding 0.1.7 km to the original project scope will result in the linking of PRE 4, PRE 12, MAA3 and GAI 2/PRE 8. The segment along Lopez Jaena supplies the RMC Gymnasium, one of the major event centers of Davao City. Cost indicated includes both the original and additional project scope.
30
3
Recloser/Sectionalizer Proposal 2021- 2023 SOD PROPOSAL LINE DEVICES EQUIPMENT
UOM
2021
2022
2023
TOTAL
RECLOSER
UNIT
57
93
50
200
SECTIONALIZER
UNIT
12
9
7
28
69
102
57
228
Total
31
3.1
2021 Recloser/Sectionalizer Proposals
NO
LOCATION
DEVICE TYPE
POLE NUMBER
FEEDER
1
QUIRINO-MAGALLANES INTERSECTION (REPLACE PRE4F_MAG, CUTOUT WITH NO FUSE)
RECLOSER
Nr PN0498414
PRE 4
2
SPMC (BAJ 2 - BAJ 4 LINK, REPLACE CUTOUT)
RECLOSER
0824415
BAJ 4
3
WHITE HOUSE (LOWER)( LINK BAJADA 3-BAJADA 4)
SECTIONALIZER
1562310
BAJ 3
4
CYBERGATE DELTA BAJADA (CONVERT EXISTING BAJ2D_CYB DS)
SECTIONALIZER
0429102
BAJ 2
5
SSS BAJADA (CONVERT EXISTING BAJ4D_SSS DS)
SECTIONALIZER
1795380
BAJ 4
6
NANYO CENTRAL ELEM SCHOOL (SVI 4 - TAD 1 LINK, REPLACEMENT OF BURNED TAD1S_NAN)
RECLOSER
0201842
TAD 1
7
STA5R_COL (COLASAS - UDS) - COLASAS, MAGALLANES CLAVERIA ROTUNDA
RECLOSER
0496430
STA 5
8
JOLLIBEE PANABO (SVI 1 - SVI 2 LINK)
RECLOSER
0222105
SVI 2
9
J.CAMUS EXT./P.TAVERA AND ARELLANO ST CROSSING (GAI2 - PRE 6 LINK)
RECLOSER
0683706
PRE 6
10
MABINI ST. AND ARELLANO ST. CROSSING (PRE 8 PRE6 LINK)
RECLOSER
TBD
PRE 8
11
F. TORRES ST AND MABINI ST. CROSSING (PRE 8 - GAI 2 LINK)
RECLOSER
1100005 (Lower)
PRE 8
12
CAL2R_BAG (CALINAN-BAGUIO) - ALONG ROAD TO MALAGOS, BAGUIO DISTRICT
RECLOSER
0331535
CAL 2
13
SAGINGAN DS
RECLOSER
0474115
TAD 1
14
TIB 4 (LOWER CKT): NEAR LA FILIPINA UY GONGCO CORP
RECLOSER
0146852
TIB 4
15
PCN 2 (LOWER CKT) : IN FRONT OF SHELL NEAR MALAGAMOT ROAD (TOWARDS ILANG)
RECLOSER
0900225
PCN 2
16
REPLACEMENT STAR HOTEL SECTIONALIZER (LINK GAI 2 - PRE 6)
SECTIONALIZER
0643223
GAI 2
17
MAA 3: CITY JAIL DS AT PN 0619943
RECLOSER
0619943
MAA 3
18
MAA 3: CONVENIENCE STORE DS AT PN 0804741
RECLOSER
0804741
MAA 3
19
ECO 2: NEAR FORMER NCCC MALL PARKING AREA
RECLOSER
0441380
ECO 2
20
SHELL MA-A (NR. JOLLIBEE MA-A)
RECLOSER
1689780
MAA 1
21
NEAR SHELL STATION( LINK CALINAN 4-CALINAN 3)
RECLOSER
1692802
CAL 3
22
CONVERT LEA SUBD DS @ PN 1221900 TO
RECLOSER
1221900
BUH 1 - BUH
32
SECTIONALIZER 23
CONVERT NR SS DS @ PN 0511386 TO SECTIONALIZER
24
2 RECLOSER
0511386
BUH 2 - BUH 3
CONVERT SM LANANG DS @ PN 1130823 TO SECTIONALIZER
SECTIONALIZER
1130823
BUH 2 - RCA 1
25
CONVERT DS @ NISSAN PN 0918903 TO SECTIONALIZER
SECTIONALIZER
0918903
GAI 2
26
CONVERT DS @ CHOICEMART PN 0290875 SECTIONALIZER
RECLOSER
0290875
GAI 3 - VIC 1
27
CONVERT DS @ DURIAN HOTEL PN 0358545 SECTIONALIZER
SECTIONALIZER
0358545
VIC 1
28
CONVERT DS @ COCOBOO PN 0430522 SECTIONALIZER
SECTIONALIZER
0430522
VIC 1 - BAJ 6
29
CORNER ACACIA AND CHAMPACA ST.
RECLOSER
0990586
ECO 4
30
PALAN DRIVE DS
RECLOSER
0455745
BUH 1
31
SEVEN ELEVEN CABAGUIO COR VILLAMOR ST.
RECLOSER
0476466
VIC-4-BAJ2
32
ROAD GOING TO CALLAWA (CALLAWA FUSE CUTOUT)
RECLOSER
0090444
MAA 4
33
CORNER N. TORRES ST. AND VILLAMOR ST.
RECLOSER
0774184
VIC 3 - VIC 4 LINK
34
CORNER PORRAS ST. AND VILLAMOR ST.
RECLOSER
1827502
VIC 4
35
CAL2R_WNG (CALINAN - WANGAN) - ROAD GOING TO TAMAYONG, CALINAN
RECLOSER
0417626
CAL 2
36
MERCURY DRUG BANGKEROHAN (UPPER)
RECLOSER
0850746
PRE 5
37
CONVERT SVI2D_CIT DS - SVI 2 AND PBO 1 LINK DS (NEAR CITY HALL)
RECLOSER
0221982
SVI 2
38
CONVERT PBO2D_SEA - NEAR PANABO SEA OIL DS
RECLOSER
0966552
PBO 2
39
MERCURY DRUG CABANTIAN: FIRST POLE AFTER CORNER CABANTIAN ROAD AND COUNTRY HOMES ROAD (TOWARDS INDANGAN)
RECLOSER
TBD
BUH 4
40
FRONTING FORESTLAKE MEMORIAL PARKS GATE
RECLOSER
0591843
ECO 2
41
NEAR SANTIAGO VILLAS, CATALUNAN GRANDE (EXISTING DS TUG3D_SAN)
RECLOSER
1215032
TUG 3
42
NANGKA ST., TUGBOK (EXISTING DS TUG3D_NNG)
RECLOSER
1532246
TUG 3 TAD1 MAA4
43
STANFILCO PANABO - PV SOLAR
RECLOSER
Ref PN 0474701
44
NEAR INDAGAN TERMINAL LATERAL TAPPING POINT (SPLITTER BETWEEN MAA4S_PLV AND BUH4S_CIU
RECLOSER
1193374
33
45
CONVERT PAM2D_LEG (PAM2D_LEG )
RECLOSER
0747340
PAM 2
46
FOTON( LINK PANACAN 1-PAMPANGA 3)
RECLOSER
1621414
PCN 1
47
CONVERT BAJ3D_SAM (SAMULCO BUHANGIN, NEAR OVER-PASS)
RECLOSER
0838882
BAJ 3
48
ECO5S_SGR REPLACEMENT OR REINSTALLATION (NEAR SOUTH GROOVE, QUIMPO BLVD)
SECTIONALIZER
0847160
ECO 5
49
CASA RUBY, MARFORI (PRE6 ISOLATION/SECTIONALIZING)
SECTIONALIZER
0091194 Upper
PRE 6
50
OVERPASS NEAR ALMENDRAS GYM
SECTIONALIZER
0249100
STA 5
51
V. MAPA - J.P. LAUREL JUNCTION (V. MAPA LATERAL)
RECLOSER
0058676
GAI 2
52
V. MAPA - J. CAMUS CROSSING (FOR SECTIONALIZATION OF PRE 8 )
RECLOSER
ref PN: 0685022
PRE 8
53
ABREEZA ENTRANE CAR PARK( LINK BAJADA 1-BAJADA 7)
SECTIONALIZER
1100174 Lower
BAJ 1
54
TALOMO BRIDGE BANDA CANAL( LINK BANGKAL 2-PUAN 3)
RECLOSER
0509916
BKL 2
55
TALOMO BRIDGE BANDA KALSADA( LINK BANGKAL 3-PUAN 1)
RECLOSER
0509916
BKL 3
56
GMALL PARKING EXIT( LINK GAISANO 4-GAISANO 6)
RECLOSER
0402633
GAI 4
57
GAISANO SUBSTATION( LINK GAISANO 4-GAISANO 5)
RECLOSER
0457501
GAI 4
58
NEAR UNIFRUTTI (UPPER CKT)
RECLOSER
0968461
TIB 2
59
69 KV POLE IN BETWEEN HOLCIM BRIDGE AND ILANG OVERPASS (UPPER CKT)
RECLOSER
1195655
TIB 2
60
INFRONT MOSQUE (UPPER CKT)
RECLOSER
0963513
TIB 2
61
HANNIE'S INN ( LINK PUAN 1-PUAN 3)
RECLOSER
0291990
PUA 1
62
LOWER CIRCUIT, ALONG H-WAY BAGO APLAYA( LINK PUAN 2-PUAN 3)
RECLOSER
0518782
PUA 2
63
APO GULF (CARWASH)( LINK PUAN 2-PUAN 3)
RECLOSER
0781040
PUA 2
64
AUB( LINK R.CASTILLO 3-VICTORIA 3)
RECLOSER
0638206
RCA 3
65
AGDAO FLYOVER( LINK R.CASTILLO 3-BAJADA 2)
RECLOSER
0779161
RCA 3
66
GENERICA( LINK SAN VICENTE 1-SAN VICENTE 4)
RECLOSER
0989060
SVI 1
67
CONVERT MAA4F_IND (INDANGAN NEAR BRGY HALL FUSE CUT-OUT)
RECLOSER
0347065
MAA 4
68
New DS at PN1939750 (BUH 5 - BUH 7 Link) Near Jehovah Kingdom Hall
RECLOSER
1939750
BUH 7
34
69
RMC Lateral with Bypassed cutout
RECLOSER
0648696
PRE 8
35
3.2
2022 Recloser/Sectionalizer Proposals
NO
LOCATION
DEVICE TYPE
POLE NUMBER
FEEDER
RECLOSER
0787755
SVI 2
FRONTING SS CARWASH( LINK SAN VICENTE 2-SAN 1
VICENTE 5) SANTOL STREET (BUH 4 LATERAL / BACKBONE FROM
2
DIVERSION ROAD)
TBA see this RECLOSER
ALONG DUMANLAS ROAD, FRONTING SPMC (BAJ 4 3
BUH 4 LINK)
Street View
BUH 4
TBA see this SECTIONALIZER
Street View
BAJ 4
TBA see this 4
ALONG JP LAUREL, NEAR CARMELITE CHURCH
RECLOSER
ALONG JP LAUREL, INFRONT DOH - BLOOD BANK 5
(BAJ 4 - BUH 4 LINK)
Street View
BUH 2
TBA see this SECTIONALIZER
Street View
BAJ 4
RECLOSER
1756490
PRE 8
RECLOSER
0696715
GAI 2
COVERT DS AT CAFE TAVERA GAI2D_TAV F.TORRES - J. CAMUS CROSSING (FOR 6
SECTIONALIZATION OF PRE 8 ) JP LAUREL - TORRES X'NG (TO SERVE AS PRE 8 - GAI 2
7
LINK) STA ANA AVE - L.GUERRERO CROSSING (GAI 4 - PRE 9 LINK)
8
CONVERT GAI4D_ALA - ALABASTRO
PN 0498856 RECLOSER
NEAR RAMON MAGSAYSAY AVE - SUAZO ST 9
CROSSING (PRE 9 - PRE 2 LINK)
(UPPER)
PRE 9
ref PN: RECLOSER
0849745
PRE 9
ref PN: 10
F.TORRES - EMILIO JACINTO EXT. (PRE 10 - VIC 2 LINK)
RECLOSER
8007572
V.MAPA - EMILIO JACINTO EXT. CROSSING (PRE 10 -
PRE 10
ref PN:
11
GAI 2 LINK)
RECLOSER
0854655
PRE 10
12
ORANGE GROOVE HOTEL (BUH 4 - BAJ 3 LINK)
RECLOSER
2015572
BUH 4
13
SUMIFRU( LINK TIBUNGCO 2-TIBUNGCO 4)
SECTIONALIZER
0944253
TIB 2
14
CASA RUBY, MARFORI (MAA 3 - GAI 2 LINK)
SECTIONALIZER
Lower
MAA 3
1100044 -
ALONG PALMA GIL ST; PRE3 LATERAL SUPPLYING 15
P-PARK
RECLOSER
0989866
PRE 3
16
ALONG PELAYO ST; LATERAL OF PRE4
RECLOSER
0498315
PRE 4
17
BUNAWAN SS( LINK BUNAWAN 2-TIBUNGCO 3)
RECLOSER
0836265
BUN 2
36
NEAR CALINAN SUBSTATION - FACING BUDA ( LINK 18
CALINAN 1-CALINAN 2)
RECLOSER
0806962
CAL 1
INFRONT CALINAN SUBSTATION( LINK CALINAN 19
1-CALINAN 3)
RECLOSER
0384434
CAL 1
20
MOTOLITE DS( LINK CALINAN 2-CALINAN 3)
RECLOSER
0594812
CAL 2
RECLOSER
0538220
CAL 3
SECTIONALIZER
0068480
MAT 1
RECLOSER
0937723
STO 2
SECTIONALIZER
0683631
PRE 4
SECTIONALIZER
0683631
PRE 5
RECLOSER
TBA
TUG 1
RECLOSER
0674005
CAL 2
RECLOSER
0294532
CAL 3
NEAR BARON CARWASH( LINK CALINAN 3 - CALINAN 21
4)
22
CAIEM COCO LUMBER( LINK MATINA 1-MATINA 2)
23
NEAR STO2 AVR( LINK STO. TOMAS 2-STO TOMAS 3) ALONG ELPIDIO QUIRINO AVENUE NEAR DAVAO
24
DOCTORS HOSPITAL (DDH SIDE) ALONG ELPIDIO QUIRINO AVENUE NEAR DAVAO
25
DOCTORS HOSPITAL (SANTOS BUILDING 2 SIDE) MINTAL HFRAME BESIDE BDO NETWORK BANK
26
(HFRAME OCB UNIT - TO PLANT2) NEAR CALINAN ELEM SCHOOL (EXISTING DS,
27
CAL2D_CES) CALINAN NAT'L HIGHWAY, PALAYAN (EXISTING DS,
28
CAL3D_PAL) BESIDE ANSUICO BUILDING AND IN FRONT DPWH, PANACAN, DAVAO CITY (INTERCONNECTION
29
BETWEEN PCN04 AND PCN05)
RECLOSER
1684855
PCN05
30
ARELLANO COR MABINI
RECLOSER
0684464
BAJ9/PRE6
31
BONIFACIO COR PONCIANO
RECLOSER
1150263
PRE3
32
MATINA SANDAWA
RECLOSER
0592463
PRE5
33
QUIRINO
RECLOSER
0985395
PRE 4
34
NEAR DCCC
RECLOSER
1214040
TIB04
35
NEAR SHELL
RECLOSER
2111985
TIB04
RECLOSER
0595463
TUG 1
RECLOSER
1830823
TUG 4
RECLOSER
0203184
TUG 4
NEAR DACUDAO TUGBOK MAUSOLEUM (EXISTING 36
DS, TUG1D_NDM) NEAR ANGALAN BRIDGE 1 (EXISTING DS,
37
TUG4D_ABR1) NEAR ANGALAN BRIDGE 3 (EXISTING DS,
38
TUG4D_ABR3)
37
CONVERT MAA4F_PAL (PALOS VERDES FUSE 39
CUT-OUT)
RECLOSER
0090436
MAA 4
RECLOSER
2015672
BUH 4
RECLOSER
0378266
BUN 4
RECLOSER
0899462
PCN 1
RECLOSER
0691510
PBO 2
ORANGE GROVE HOTEL, BUHANGIN (LINK BETWEEN 40
BAJ03 AND NEW BUH04) CONVERT BUN4D_MAH (CORNER MAHAYAG, PART
41
OF NEW BUN 4) DPWH/ FRONTING PETRON( LINK PANACAN
42
1-PAMPANGA 3) INFRONT PANABO SUBSTATION (LATERAL LINE, REPLACEMENT OF EXISTING CUTOUT FUSE
43
PROTECTION) CONVERT RCA3D_HER (HERZY CARWASH,
44
R.CASTILLO ST.)
RECLOSER
0555383
RCA 3
45
STO TOMAS, MARSCON GYMNASIUM
RECLOSER
2339360
STA 2
46
CONVERT BKL2D_MBR (NEAR MINTAL BRIDGE)
RECLOSER
1534254
TUG 3
47
CONVERT TUG1D_FSS (FRONT SASEDOR SHOP)
RECLOSER
0667035
TUG 3
48
N.TORRES COR. LOYOLA OBRERO
RECLOSER
0695905
VIC 3
49
BAJADA FRONTING V.PLAZA MALL
RECLOSER
0394854
VIC 1
RECLOSER
Inside SS
CAL 3
INSIDE CAL SS - BYPASS DS FOR CAL 3 (33 MVA & 10 50
MVA) NEAR DBCOM ENTRANCE( LINK PANACAN
51
4-TIBUNGCO 2)
SECTIONALIZER
0900324
PCN 4
52
CONVERT PCN1D_BUL (DS BULALOAN, NEAR DPWH)
SECTIONALIZER
0121675
PCN 1
53
FRONTING FORESTLAKE MEMORIAL PARKS GATE
RECLOSER
0591843
ECO 2
RECLOSER
0290092
BAJ 6 / VIC 1
RECLOSER
TBD
CAL 3
RECLOSER
TBD
CAL 3
RECLOSER
0806452
MAA 4
RECLOSER
0456920
PCN 1
CONVERT BAJ6D_FFX 54
FARM FIX, DIVERSION DEVICE 1 BETWEEN CAL3R_LAC (LACSON RECLOSER)
55
AND CAL3R_GUM (GUMALANG RECLOSER) DEVICE 2 BETWEEN CAL3R_LAC (LACSON RECLOSER)
56
AND CAL3R_GUM (GUMALANG RECLOSER) PILAR P. RODRIGUEZ ELEMENTARY SCHOOL,TIGATTO, BUHANGIN, DAVAO CITY, DAVAO DEL SUR,
57
PHILIPPINES
58
CONVERT PCN1D_1L2
38
MABUHAY EMISSION TEST( LINK PANACAN 1-PANACAN 2) CONVERT PCN4D_COO 59
AGDAO COOP, PANACAN
RECLOSER
REPLACE DEFECTIVE TBO4S_ILA 60
ILANG OVERPASS SECTIONALIZER
1172593 RECLOSER
(LOWER)
RECLOSER
(ROAD SIDE)
CONVERT TIB1D_BES 61
BUHISAN ELEM (ROAD SIDE)
0242383
CONVERT TIB1D_A1 62
NEAR A1
0797483
RECLOSER
PCN 4
TIB 4
TIB 3
0927540
TIB 1
0903660
BUN 1
BUN1R_DRA REPLACEMENT (POLE AFFECTED BY ROAD WIDENING; ONLINE BUT CAN'T BE ACCESSED BY SCADA; CONTROL BOX 63
OBSERVED TO HAVE DENTS DUE TO COLLISION)
RECLOSER
64
JADE VALLEY FREQUENTLY FLOODED LATERAL 1
RECLOSER
TBD
MAA 4
65
JADE VALLEY FREQUENTLY FLOODED LATERAL 2
RECLOSER
TBD
MAA 4
66
JADE VALLEY FREQUENTLY FLOODED LATERAL 3
RECLOSER
TBD
MAA 4
TBD
VIC 1
TBD
VIC 1
PHASE 5 EL RIO SUBDIVISION FREQUENTLY FLOODED 67
LATERAL 1
RECLOSER
PHASE 5 EL RIO SUBDIVISION FREQUENTLY FLOODED 68
LATERAL 2
RECLOSER
Ref PN0983112 69
PREYES 1 ISOLATION POINTS OUTSIDE SS
RECLOSER
- Upper Ref PN0983112
70
PREYES 3 ISOLATION POINTS OUTSIDE SS
RECLOSER
- Lower Ref PN0882620
71
PREYES 4 ISOLATION POINTS OUTSIDE SS
RECLOSER
- Facing DepEd
PRE 1
PRE 3
PRE 4
Ref PN0882620 - Facing
PRE 5
72
PREYES 5 ISOLATION POINTS OUTSIDE SS
RECLOSER
Canteen
73
PREYES 6 ISOLATION POINTS OUTSIDE SS
RECLOSER
Ref PN0456966
PRE 6
Ref PN0456966
PRE 8
PREYES 8 ISOLATION POINTS OUTSIDE SS 74