CUADRO RESUMEN DE COSTOS PROYECTO: CONSTRUCCION DE SISTEMA DE AGUA BBQ
DESCRIPCION CAJA TOMA LINEA DE CONDUCCION LINEA DE DISTRIBUCION EL BOSQUE TANQUES ROMPE CARGA EL BOSQUE TANQUE DE ALMACENAMIENTO EL BOSQUE CLORADORES DE TABLETA EL BOSQUE LINEA DE DISTRIBUCION EL BOQUERON TANQUES ROMPE CARGA EL BOQURON TANQUE DE ALMACENAMIENTO EL BOQUERON CLORADORES DE TABLETA EL BOQUERON LINEA DE DISTRIBUCION QUEBRADA DE ORO TANQUES ROMPE CARGA QUEBRADA DE ORO TANQUE DE ALMACENAMIENTO QUEBRADA DE ORO CLORADORES DE TABLETA QUEBRADA DE ORO CONEXIONES DOMICILIARIAS CERCO DE PROTECCION PARA FUENTE LETRINAS Y LAVADOS TOTAL
Aporte comunitario Aporte externo Total 2,978.58 33,104.70 36,083.28 380,393.04 973,881.87 1,354,274.91 167,009.31 147,217.77 314,227.08 3,819.24 48,693.16 52,512.40 7,722.52 406.80
126,217.87 10,797.50
133,940.39 11,204.30
243,480.51 9,548.10
196,691.76 118,826.95
440,172.27 128,375.05
7,722.52
126,217.87
133,940.39
406.80
10,797.50
11,204.30
339,421.12
289,109.11
628,530.23
9,548.10
117,982.91
127,531.01
7,722.52
126,217.87
133,940.39
406.80 29,506.05 432.00 288,000.00 1,498,524.01
10,797.50 158,469.81 4,137.12 604,430.00 3,103,591.27
11,204.30 187,975.86 4,569.12 892,430.00 4,602,115.28 455,609.41
1,498,524.01
3,716,206.46
Overhead (9.9%) Capacitación y educación en Saneamiento e higiene y administración del sistema de agua FINAL TOTAL IN LEMPIRAS
157,005.78 5,214,730.47
#
Descripcion
Unidad
Cantidad Obra
Materiales Nacionales
Mano de obra
Importados
Calificada
No Calificada
Herramientas y Equipos
Aporte Comunitario
Aporte Externo
Total
Caja Toma 1
Trazado con teodolito por dia
JDR
1.00
5.12
16.70
500.00
361.00
834.44
361.00
2
Excavacion tipo I
M3
1.30
-
-
-
138.06
6.90
144.96
3
Acarreo de material sin volqueta
M3
1.30
-
-
-
70.20
3.51
73.71
4
Cimentación de mamposteria con cama de 5cm
M3
0.87
1,862.90
-
89.81
52.15
5.68
52.15
1,958.39
2,010.54
5
Piso de concreto reforzado de 10 cm, #2@15 cm
M2
3.95
1,634.40
-
232.66
135.09
14.69
135.09
1,881.75
2,016.84
6
Losa de concreto e=10 cm, var. #2@20 cm
M2
0.82
518.06
-
127.10
73.80
8.04
73.80
653.20
727.00
7
Pared de ladrillo rafon reforzado
M2
6.46
4,479.36
-
400.52
232.56
25.32
232.56
4,905.20
5,137.76
8
Solera 10x15 cm, 2#3 + #2@15 cm
ML
5.16
549.80
-
259.14
150.47
16.41
150.47
825.35
975.82
9
Repello y pulido de paredes
M2
17.35
1,772.13
-
839.05
487.19
66.28
487.19
2,677.46
3,164.65
10
Afinado e=5cm
M2
14.54
319.16
-
333.55
193.67
21.08
193.67
673.79
867.46
11
Tapadera de concreto 0.70x0.70x0.10 mts var.
UND
1.00
253.88
-
43.40
25.20
2.74
25.20
300.02
325.22
12
Filtro
M3
1.24
1,156.18
-
-
111.60
4.46
111.60
1,160.64
1,272.24
13
Impermeabilización (aplicado con brocha)
M2
14.54
292.98
170.12
18.47
170.12
1,749.46
1,919.58
14
Caja de valvula 70x70x40 cms
UND
1.00
1,915.20
-
331.70
192.60
20.97
192.60
2,267.87
2,460.47
15
Pantalla difusora caja toma = 5cm, #2@7 cm V,
M2
2.00
1,092.64
-
99.20
57.60
6.28
57.60
1,198.12
1,255.72
16
Casquete caja de valvulas e=6 cm, 2#2, #2@20
ML
2.00
286.54
-
99.20
57.60
6.28
57.60
392.02
449.62
17
Piso de concreto simple e=8 cm
M2
6.91
1,709.74
-
329.88
191.55
20.87
191.55
2,060.49
2,252.04
18
Encofrado De Losa Superior
M2
0.82
249.62
-
25.42
14.76
1.61
14.76
276.65
291.41
19
Concreto ciclopeo
M3
0.75
2,426.95
-
124.39
72.22
84.08
72.22
2,635.42
2,707.64
20
Tapadera concreto caja e=6 cm, var. #2@ 10 cm
M2
1.15
439.06
-
57.04
33.12
3.61
33.12
499.71
532.83
21
Castillo 4#3, #2 @0.20
ML
4.94
862.63
-
254.21
147.61
16.06
147.61
1,132.90
1,280.51
22
Accesorios caja toma
GLB
1.00
Su
btotal en CAJA TOMA
-
4,500.00 26,033.37
1,438.01
1,454.71
4,439.25
2,968.17
1,187.78
2,978.58
1,356.26
1,717.26 144.96 73.71
4,500.00
4,500.00
33,104.70
36,083.28
#
Descripcion
Unidad
Cantidad Obra
Materiales Nacionales
Mano de obra
Importados
Calificada
No Calificada
Herramientas y Equipos
Aporte Comunitario
Aporte Externo
Total
LINEA DE CONDUCCION 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Su
Trazado con Teodolito Chapeo y Limpieza (hasta 10 mts) Excavacion de material tipo I y relleno mat. Suministro de tuberia HG de 3" SCH-40 Suministro De Tuberia H.G 2-1/2" SCH-40 Suministro de Tuberia HG SCH40 de 2" Instalacion de tuberia HG de 3" Instalacion De Tuberia HG SCH-40 De 21/2" Instalacion de tuberia HG SCH40 2" Suministro de tuberia PVC RD-26 de 3" Suministro De Tuberia PVC RD-26 De 21\2" Suministro de tuberia PVC RD26 de 2" Suministro de tuberia PVC RD26 de 1.5" Instalacion de tuberia PVC de 3" AP Instalacion De Tuberia PVC De 2-1\2" Instalacion de tuberia PVC RD-26 de 2" Instalacion de tuberia PVC RD26 1.5" Caja de valvulas 0.40x0.40x0.60 Valvula de aire de 1.5" Caja de valvulas 0.40x0.40x0.60 Valvula compuerta de 2" Anclajes De Concreto 40x45x45 Cms. 2#4 @ 20 Accesorios para tubería potable Tanque rompe carga btotal en LINEA DE CONDUCCION
ML M2 M3 Lance Lance Lance ML M.L. ML Lance Lance Lance Lance ML M.L. ML ML UND UND UND UND UNID GLOBAL UND
6,938.60 69,386.00 1,942.81 5.38 100.42 187.05 32.30 612.30 1,122.30 4.53 202.32 607.60 47.50 27.20 1,213.90 3,645.60 285.00 2.00 2.00 3.00 3.00 55.00
16,097.56 262,096.20 2,061.15 58,672.80 78,988.00 2,563.92 3,845.88 19,365.50
17,000.80 374,100.00 40.05 759.25 6,365.00 18.23 813.32 2,442.55 190.95 1,400.00 2,307.00 -
20,815.80 430.56 7,592.52 9,741.56 295.12 11,289.27 20,342.45 1,590.30 545.60 145.70 818.40 218.55 2,745.05
7,563.08 87,426.36 234,302.89 250.00 4,408.56 5,656.39 171.36 6,555.06 11,811.74 923.40 316.80 475.20 1,593.90
29,142.12 4,163.16 11,715.14 27.13 477.59 617.26 9.25 716.20 656.21 51.30 34.50 4.38 51.75 6.57 173.80
7,563.08 91,589.52 246,018.03 250.00 4,408.56 5,656.39 171.36 6,555.06 11,811.74 923.40 316.80 475.20 1,593.90
1.00 1.00
7,000.00 5,481.27 456,172.28
405,437.15
3,410.00 79,980.88
3,060.00 364,514.74
323.50 48,169.86
3,060.00 380,393.04
66,055.48
17,000.80 262,096.20 374,100.00 497.74 8,829.36 10,358.82 2,061.15 58,672.80 78,988.00 6,365.00 322.60 12,818.79 23,441.21 1,832.55 3,144.02 1,550.08 4,716.03 2,532.12
73,618.56 91,589.52 246,018.03 17,000.80 262,096.20 374,100.00 747.74 13,237.92 16,015.21 2,061.15 58,672.80 78,988.00 6,365.00 493.96 19,373.85 35,252.95 2,755.95 3,460.82 1,550.08 5,191.23 2,532.12
22,284.35 7,000.00 9,214.77 973,881.87
23,878.25 7,000.00 12,274.77 1,354,274.91
#
Descripcion
Unidad
Cantidad Obra
Materiales Nacionales
Mano de obra
Importados
Calificada
No Calificada
Herramientas y Equipos
Aporte Comunitario
Aporte Externo
Total
LINEA DE DISTRIBUCION EL BOSQUE 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 Su
Trazado con Teodolito Chapeo y Limpieza (hasta 10 mts) Excavacion de material tipo I y relleno mat. Suministro de tuberia PVC RD26 de 1.5" Suministro de tuberia PVC RD26 de 1" Suministro De Tuberia PVC RD-21 De 3/4" Instalacion de tuberia PVC RD26 1.5" Instalacion de tuberia PVC RD26 1" Instalacion de tuberia PVC RD26 3/4" Caja de valvulas 0.40x0.40x0.60 Valvula de aire de 1.5" Caja de valvulas 0.40x0.40x0.60 Valvula de compuerta de 1-1/2" Caja de valvula 70x70x40 cms Medidor de agua potable de 1" Anclajes De Concreto 40x45x45 Cms. 2#4 @ 20 Accesorios linea de distribución btotal en LINEA DE DISTRIBUCION EL BOSQUE
70
TANQUES ROMPE CARGA (5 UND) Trazado y marcado Excavacion tipo I Cimentación de mamposteria con cama de 5cm Losa de concreto e=10 cm, var. #2@20 cm
71 72 73 74 75 76
Pared de ladrillo rafon reforzado Repello en paredes Pulido de paredes Afinado e=5cm Loseta tipo I Loseta tipo II
67 68 69
ML M2 M3 Lance Lance Lance ML ML ML UND UND UND UNID UND Unidad UNID GBL
3,917.00 39,170.00 822.57 7.33 379.00 266.50 44.00 2,274.00 1,599.00 5.00 5.00 6.00 6.00 1.00 1.00 8.00 1.00
9,087.44 28,046.00 16,523.00 6,409.80 7,691.76 1,915.20 2,816.80 72,490.00
ML M3 M3
40.00 6.00 6.00
204.80 12,847.56
M2
5.60
M2 M2 M2 M2 ML ML
16.00 32.00 32.00 32.00 8.00 4.00
982.22 29.48 1,523.58 1,071.33 3,500.00 2,100.00 600.00 3,169.77 12,976.38
11,751.00 245.52 11,279.04 7,435.35 1,364.00 364.25 1,636.80 744.00 331.70 232.50 399.28 1,240.00 37,023.44
4,269.53 49,354.20 99,201.94 142.56 6,549.12 4,605.12 792.00 950.40 192.60 231.84 720.00 167,009.31
16,451.40 2,350.20 4,960.10 7.92 363.84 239.85 86.25 10.95 103.50 22.32 20.97 6.97 25.28 78.40 24,727.95
4,269.53 49,354.20 99,201.94 142.56 6,549.12 4,605.12 792.00 950.40 192.60 231.84 720.00 167,009.31
37,289.84 2,350.20 4,960.10 982.22 28,046.00 16,523.00 282.92 13,166.46 8,746.53 7,860.05 3,875.20 9,432.06 2,866.32 2,267.87 839.47 3,241.36 4,488.17 147,217.77
41,559.37 51,704.40 104,162.04 982.22 28,046.00 16,523.00 425.48 19,715.58 13,351.65 8,652.05 3,875.20 10,382.46 2,866.32 2,460.47 839.47 3,473.20 5,208.17 314,227.08
-
198.40 619.38
115.20 637.20 359.64
12.40 31.86 39.18
115.20 637.20 359.64
415.60 31.86
530.80 669.06
13,506.12
13,865.76
3,538.02
-
868.00
504.00
54.88
504.00
11,094.40 2,631.36 748.80 702.40 2,385.04 1,182.48
-
992.00 773.76 624.96 734.08 446.40 223.20
576.00 449.28 362.88 426.24 259.20 129.60
62.72 48.96 39.36 46.40 28.24 14.12
576.00 449.28 362.88 426.24 259.20 129.60
4,460.90 12,149.12 3,454.08 1,413.12 1,482.88 2,859.68 1,419.80
4,964.90 12,725.12 3,903.36 1,776.00 1,909.12 3,118.88 1,549.40
#
Descripcion
Unidad
Cantidad Obra
Materiales Nacionales
Mano de obra
Importados
Calificada
No Calificada
Herramientas y Equipos
Aporte Comunitario
Aporte Externo
Total
54,717.16 3,448.56 7,278.21 302.90 1,027.78 50,995.62
60,982.05 75,868.32 152,842.41 302.90 1,027.78 50,995.62
16,045.60
16,045.60
90.02 295.78 23,940.49 8,493.81 4,716.03 1,725.12 9,432.06 2,130.24 2,267.87 839.47 4,456.87 4,488.17 196,691.76
135.38 444.82 35,848.71 12,965.87 5,191.23 1,725.12 10,382.46 2,130.24 2,460.47 839.47 4,775.65 5,208.17 440,172.27
1,039.00 79.65
1,327.00 1,672.65
33,765.30
34,664.40
11,152.26 30,372.80 8,635.20
12,412.26 31,812.80 9,758.40
LINEA DE DISTRIBUCION EL BOQUERON 95 96 97 98 99 100 101
Trazado con Teodolito Chapeo y Limpieza (hasta 10 mts) Excavacion de material tipo I y relleno mat. Suministro de tuberia PVC RD26 de 2" Suministro de tuberia PVC RD26 de 1.5" Suministro de tuberia PVC RD26 de 1" Suministro De Tuberia PVC RD-21 De 3/4" 102 Instalacion de tuberia PVC RD-26 de 2"
ML M2 M3 Lance Lance Lance Lance ML
103 Instalacion de tuberia PVC RD26 1.5" 104 Instalacion de tuberia PVC RD26 1" 105 Instalacion de tuberia PVC RD26 3/4" 106 Caja de valvulas 0.40x0.40x0.60 107 Valvula de aire de 1" 108 Caja de valvulas 0.40x0.40x0.60 109 Valvula compuerta de 1" 110 Caja de valvula 70x70x40 cms 111 Medidor de agua potable de 1" 112 Anclajes De Concreto 40x45x45 Cms. @ 20 linea de distribución 113 2#4 Accesorios Subtotal en LINEA DE DISTRIBUCION EL BOQUERO
116 117 118 119 120 121
TANQUES ROMPE CARGA (10 UND) Trazado y marcado Excavacion tipo I Cimentación de mamposteria con cama de 5cm Losa de concreto e=10 cm, var. #2@20 cm Pared de ladrillo rafon reforzado Repello en paredes
ML ML ML UND UND UND UND UND UND
5,747.60 57,476.00 1,207.00 2.33 7.67 689.13 258.80 14.00
13,334.44 302.90 50,995.62 16,045.60 -
46.00 4,134.80 1,552.80 3.00 3.00 6.00 6.00 1.00 1.00 11.00 1.00
3,845.88 7,691.76 1,915.20 3,873.10 98,004.50
ML M3 M3
100.00 15.00 15.00
512.00 32,118.90
M2
14.00
M2 M2
40.00 80.00
UND GBL
1,027.78 -
17,242.80 -
6,264.89 72,419.76 145,564.20 -
24,139.92 3,448.56 7,278.21 -
6,264.89 72,419.76 145,564.20 -
9.38
78.12
45.36
2.52
45.36
30.82 2,770.31 1,040.37 1,500.00 1,680.00 600.00 3,169.77 11,828.43
256.68 20,508.61 7,220.52 818.40 218.55 1,636.80 437.10 331.70 232.50 549.01 1,240.00 50,770.79
149.04 11,908.22 4,472.06 475.20 950.40 192.60 318.78 720.00 243,480.51
8.28 661.57 232.92 51.75 6.57 103.50 13.14 20.97 6.97 34.76 78.40 36,088.04
149.04 11,908.22 4,472.06 475.20 950.40 192.60 318.78 720.00 243,480.51
-
496.00 1,548.45
288.00 1,593.00 899.10
31.00 79.65 97.95
288.00 1,593.00 899.10
8,845.06
-
2,170.00
1,260.00
137.20
1,260.00
27,736.00 6,578.40
-
2,480.00 1,934.40
1,440.00 1,123.20
156.80 122.40
1,440.00 1,123.20
#
Descripcion
Unidad
Cantidad Obra
Materiales Nacionales
Mano de obra
Importados
Calificada
No Calificada
Herramientas y Equipos
Aporte Comunitario
Aporte Externo
Total
LINEA DE DISTRIBUCION QUEBRADA DE ORO 145 Trazado con Teodolito
ML
8,014.50
8,735.80
33,660.90
8,735.80
76,298.03
85,033.83
146 Chapeo y Limpieza (hasta 10 mts)
M2
80,145.00
18,593.63 -
-
-
-
100,982.70
4,808.70
100,982.70
4,808.70
105,791.40
147 Excavacion de material tipo I y relleno mat.
M3
1,683.05
-
-
-
202,975.83
10,148.79
202,975.83 10,148.79
213,124.62
-
47,874.18
47,874.18
50,052.12
50,052.12
18,730.20
18,730.20
13,783.35
20,728.61
23,497.56
35,185.46
148 Suministro de tuberia PVC RD26 de 1.5"
Lance
357.27
149 Suministro de tuberia PVC RD26 de 1"
Lance
676.38
50,052.12
150 Suministro De Tuberia PVC RD-21 De 3/4"
Lance
302.10
18,730.20
152 Instalacion de tuberia PVC RD26 1.5"
ML
2,143.60
-
1,436.21
11,961.29
6,945.26
385.85
6,945.26
153 Instalacion de tuberia PVC RD26 1"
ML
4,058.30
-
2,719.06
20,129.17
11,687.90
649.33
11,687.90
154 Instalacion de tuberia PVC RD26 3/4"
ML
1,812.60
-
1,214.44
8,428.59
5,220.29
271.89
5,220.29 9,914.92
15,135.21
1,364.00
792.00
86.25
792.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
156 Caja de valvulas 0.40x0.40x0.60
UND
5.00
7,860.05
8,652.05
157 Valvula de aire de 1"
UND
3.00
-
1,500.00
218.55
-
6.57
-
1,725.12
1,725.12
158 Valvula de aire de 1.5"
UND
2.00
-
1,400.00
145.70
-
4.38
-
1,550.08
1,550.08
159 Caja de valvulas 0.40x0.40x0.60
UND
5.00
792.00
86.25
792.00
7,860.05
8,652.05
160 Valvula compuerta de 1"
UND
2.00
-
560.00
145.70
-
4.38
-
710.08
710.08
161 Valvula de compuerta de 1-1/2"
UNID
3.00
-
1,050.00
372.00
-
11.16
-
1,433.16
1,433.16
162 Caja de valvula 70x70x40 cms
UND
1.00
-
331.70
192.60
20.97
192.60
2,267.87
2,460.47
Unidad
1.00
600.00
232.50
-
6.97
-
839.47
839.47
UNID
13.00
GBL
1.00
163 Medidor de agua potable de 1" 164 Anclajes De Concreto 40x45x45 Cms. @ 20 linea de distribución 165 2#4 Accesorios
Subbtotal en LINEA DE DISTRIBUCION QUEBRADA DE ORO TANQUE ROMPE CARGA (10 UND)
6,409.80
47,874.18
24,043.50
6,409.80
1,915.20 4,577.30 106,688.05
-
-
-
1,364.00
648.83
376.74
41.08
376.74
5,267.21
5,643.95
3,169.77
1,240.00
720.00
78.40
720.00
61,523.66
70,625.53
339,421.12
50,271.87
339,421.12
4,488.17 289,109.11
5,208.17 628,530.23
#
Descripcion
Unidad
Cantidad Obra
Materiales Nacionales
Mano de obra
Importados
Calificada
No Calificada
Herramientas y Equipos
Aporte Comunitario
Aporte Externo
Total
CONEXIONES DOMICILIARIAS 195 Excavacion tipo I
M3
34.13
-
-
-
3,624.61
181.23
3,624.61
196 Relleno comp. con material del sitio
M3
34.13
192.83
-
-
1,689.44
168.94
1,689.44
Lance
213.33
10,666.50
-
-
197 Suministro de tuberia PVC RD26 de 1/2" 198 Instalacion de tuberia PVC RD26 1/2"
ML
199 Suministro de tuberia HG SCH40 de 1/2"
1,280.00
-
857.60 7,256.47
Lance
21.33
-
ML
128.00
-
201 Caja De Conexion Domiciliaria
UNID
128.00
202 Accesorios Conexion Domiciliaria
UNID
128.00
200 Instalacion de tuberia HG SCH40 1/2"
Subbtotal en CONEXIONES DOMICILIARIAS
49,770.24 -
5,952.00
3,456.00
192.00
3,456.00
-
-
-
-
-
952.32
552.96
60.16
552.96
-
34,759.68
20,183.04
2,197.76
20,183.04
-
190.72
-
181.23 361.77 10,666.50 7,001.60 7,256.47 1,012.48 86,727.68 45,262.08
3,805.84 2,051.21 10,666.50 10,457.60 7,256.47 1,565.44 106,910.72 45,262.08
40,309.76
4,761.60
60,629.57
48,423.83
46,425.60
29,506.05
2,990.81
29,506.05
158,469.81
187,975.86
2,805.12 2,805.12
241.20 241.20
952.32 952.32
432.00 432.00
138.48 138.48
432.00 432.00
4,137.12 4,137.12
4,569.12 4,569.12
CERCO DE PROTECCION PARA FUENTE
203 Cerco Alambre Puas Por M.L. Subtotal en CERCO
ML
12.00