RECOVERY OF FREIGHT RAILWAY SAN MARTIN´S LINE Rehabilitation Project
Provinces included: Buenos Aires - Santa Fe - Córdoba San Luis - Mendoza. Kms. to rehabilitate: 1360 km Amount of Investment: USD 1.600 million Trains service: freight and passengers
ti Gu
M
San Luis
er o
CHILE
Jujuy RECOVERY OF SAN MARTIN´S PARAGUAY Salta FREIGHT RAILWAY LINE
Pa
un
C15
C18
1.360km
C12
Metán
San Juan
976,540
C8
Catamarca
976,540
Chaco
C12
Santiago del Estero
Catamarca C6
M e Gu ndo tie za rr ez
Mendoza
Formosa Tracks recoveryMetán
C
Corrientes
CHILE
Salta
La R
Santa Fe La Rioja
Mendoza
La Pampa
La Rioja
San Juan
Córdoba
Entre Ríos
San Juan ne
br ed Ca Pi
Neuquén
San Buenos Aires Luis
Río Negro
SAN MARTIN LINE MITRE LINE
Neuquén
La Pampa
Mendoza
Río Ne P
CHILE
M e Gu ndo tie za rr ez
la
r
D.
Sa
Mendoza
fo rc
Ru
fin
ad a
o
Neuquén
U
Soldini
ro
San Luis Pa u
CHILE
M e Gu ndo tie za rr ez
C
Entre PARAGUAY Jujuy Ríos Soldini C15
C18
C18
STRETCHES
Corrientes
C6
Formosa Santa Fe
Formosa
C
Cabred - Sofocarda
D. Ca br ed
Chaco
Chaco
C12
Metán
Province: Buenos Aires 391km line renewal
976,540
r
Sa
Ru
fo rc a
da
fin o
Salta
la
BRASIL
C12
C8
Santiago del Estero
Pi C12 Córdoba Santiago Catamarca
URPARAGUAY UGUAY
C
del Estero Misiones
Mision
C6 Entre Corrientes Ríos Sofocarda -URUG Paunero Soldini Santa Fe UAY
Buenos Aires Pa
un
er o
an uis
La Rioja
Provinces: Buenos Aires - Santa Fe Corrientes Córdoba 372km line renewal
ed br Ca
Sa
BRASIL
fo
Ru
rc
fin
ad
o
a
C6
Pi
la
r
D.
Santa Fe
San Juan
Córdoba
BRASI
C
Buenos Aires ez tie
rr
za
o Pa
GUAY Córdoba
Ríos
Provinces: Córdoba -Soldini San Luis- Mendoza 358km line renewal
er
a Pampa
un
Gu
do en M
Paunero - Gutierrez Entre
San Luis
d re D. C
ab
rc
Pi
la r
Sa
Mendoza
fo
Ru fin
o
ad a
C
Provincie: Santa Fe 240km line renewal
Pi la
r
D.
Ca
br e
ad
rc fo
URUGUAY
Buenos Aires
Rufino - Soldini (Mitre Line)
d
a
La Pampa Sa
Ru
fin o
Entre Ríos Soldini
Neuquén
Buenos Aires
PROJECT
GENERAL Misiones
OBJECTIVES
This Project provides the rehabilitation of 1.360 kilometres of tracks of the San Martin´s Railway with the objective of improving the connection between the Cuyo Region and Buenos Aires port. Thus, it aims at providing a trustable and efficient alternative as regards freight transportation, influencing positively in the production areas along the corridor Buenos Aires - Mendoza, generating a larger BRASIL volume of transported freight by this means and consequently a reduction in transportation costs and logistics for producers.
BENEFITS UGUAY Increase in the railway freight capacity Increase in the intermodal participation of the railway in freight transportation Reduction in logistic costs Reduction in infrastructure maintenance costs Reduction in freight in transit times More fluidity and competitiveness in railway traffic
CURRENT SITUATION
General situation of the track: Some sectors of the track need intensive improvement or total renewal, if the aim is to significantly improve the speeds of convoys so as to improve competitiveness and complementarity with other means of transport, both for passengers and freight. Characteristics: Wide gauge: 1.676 mm Freight and passenger trains circulate Average convoy: 45 wagons Track structural design: 20 tn./axis (good condition) Rolling stock: 20 tn./axis Average speed for freight train: 40 km/h Maximum speed for passenger train: 80 km/h Simple track: in many sectors of the network Extension: approximately 1050 km between Buenos Aires and Mendoza Design parameters of the projected track: Freight train circulation: with standard trains of up to 105 empty wagons (1.600 tn.) and loaded trains of up to 56 wagons (4700 tn.) Passengers train circulation: with standard trains 11 coaches of 800 tn. Maximum load per axis: -30 tn for freight convoys -22 tn/axis for passenger convoys Maximum design speed: -120 km/h for 22 tn./axis convoys -90 km/h for freight convoys Gauge: 1.676 mm Minimum design radius: 500m Ballast: 30cm thick as from sleeper’s underside Sub ballast: 35 cm thick Track: UIC 54 Sleeper: Pre-stressed concrete, weight350 kg. per unit, length 2.760 mm
La Pampa
TASKS TO BE PERFORMED Chubut Chubut
Neuquén
Santa Cruz
Río Negro
Below, some of the tasks to be performed by the contracting companies are detailed, without limitation. Development of design, engineering and executive project.
Santa Cruz
The initial survey, the elaboration of an executive project for the renewal of tracks and the complementary works and their stakeout. The removal of the existing tracks to be renewed, that shall comprise the ultrasound auscultation of the existing tracks, the marking of the detected defects and trimming thereof, the disassembly of the track structure, classification of materials, their transport and storage.
The formation of the new sub grade and the cross section of the track area according to Santa Cruz the standard profile specification and design standards.
Chubut
The assembly and installation of the new track structure in wide gauge (1.676 mm), which shall consist of rails Profile 54E1, Class “R260” 18 and/or 25 meters welded with preferably electric butt welding, or Aluminothermic, to constitute Long Welded Rail (LWR) with double elastic fastenings and monoblock concrete sleepers (at the rate of 1500 units per kilometre). The start-up of all transversal drains of the stretch. The provision of assembled Turnouts, comprising the design, supply and installation with new rails, wooden sleepers and double elastic fastenings. The construction of the indicated static turnouts.
REFERENCE REGULATIONS
Chubut
In the engineering, construction, assembly and maintenance of all the Works, the current edition of the following standards shall be complied with: Railway project • Ferrocarriles Argentinos Standards • SETOP Standard Structures:
nta Cruz • CIRSOC Rules • IRAM Standard Railway bridges and engineering work: • Ferrocarriles Argentinos: Regulation for reinforced concrete railway bridges and tensioning for railway bridges. • Argentinean Regulations for the project and construction of railway bridges of riveted steel. • Instructions to submit technical documentation of railway bridges (I-GVO- (OA) 008) • DNV: Bases for calculating reinforced concrete bridges Railway design: • DNV: Standards for geometric design. • AASHTO: “A Policy on Geometric Design of Highways and Streets” (Green Book). Safety and hygiene: • National Safety and Hygiene Law N°19587, Decree 351/79. • Municipal laws. • OSHA Regulation.
CONDITIONS OF ADMISSIBILITY
Articles of association, minutes of Shareholder´s meetings and Minutes of the Board of Directors' Meeting evidencing capacity of the Offeror and of the attorney-in-fact. Balances and audited Financial Statements, of which economic and financial indicators higher than the following ones arise: • Capital adequacy ratio higher than 1.2 • Current ratio higher than 1.2 • Total equity higher than twenty-five per cent (25%) of the Official Budget plus VAT. • Liquid assets plus Access to Credit higher than twenty-five per cent (25%) of the Official Budget plus VAT. Annual volume in construction work higher than seventy per cent (70%) of the Official Budget plus VAT. Certificate of capacity issued by a government authority that accredits capacity higher than seventy per cent (70%) of the Official Budget plus VAT. Experience at works that have reached an average monthly rate of execution higher than 2,5% of the Official Budget plus VAT. Experience in a work of similar complexity to the renewal of railway infrastructure. Technical Representative with minimum experience of 10 years in similar works. Proven property and/or third party agreements that ensure the availability of essential equipment for the execution of the work (Tamping, aligner, grader, cutting face, work trains, hoppers, shallow wagons, dynamic Stabilizer (not exclusive) train line built (not exclusive). Administrative documentation type: receipt of bid specifications purchase, bid bond, affidavits including the declaration of acceptance of the terms and conditions of the bidding documents without material deviation or conditions whatsoever, that does not have litigation against the National Government and/or its decentralized agencies. All documents submitted must be duly certified, legalized and, if necessary, translated into Spanish.
www.adifse.com.ar