Story Transcript
SCS YARD CO., LTD
Introduction • SCS Yard has 2 branches (3 landscape) at 2 locations in LCB Area. • SCS Yard 1 is located closed to main road 6.5 km away from LCB Port. Could cater up to 7,000 TEUS. • SCS Yard 2 is located closed to main road 10 km away from LCB Port. Could cater up to 10,000 TEUS.
Mission Statement • “Strive to provide high quality depot services to create user experience”
Fast facts • is an international standard container storage facility with an area of 64,000 sq.m. of reinforced concrete. • was found in 1993. • employs more than 140 staff. • Storage – Up to 6,500 TEUs • Container maintenance and repair – 3,200 m2 is reserved for repairing containers. – More than 200 TEU can be repaired up per day. • Container Electricity (Reefer Plug) • Container cleaning and washing • Transportation and others
Company Structure & Management • Company structure : Company Limited. • Ownership : Family-owned company. • Prompt and flexible actions for exceptional management as management can make ultimate decision for fast solution to customer.
Market Summary
2011-2015 Hanjin, APL, penex.
2001-2010 HMM, Mitsui O.S.K Lines, Yangming, IRISL 1995-2000 MSC, APL Liners Cho yang, P&O Nedloyd. Founded in 1993 serving a few liners given the rise of LCB port
Present HMM Zim, Evergreen, Dongjin, SM lines, IRISL
Location from port to depot
LCB Phase 1
LCB Phase 2 LCB Phase 3
Close locations to the port = lower trucking cost.
Zone 1 SCS, KRC, GForturne, Kerry, KCTC, CDS, Uniwice, Engkong, A-ONE and CCW.
Zone 2
Zone 3
SCS2 MPJ, Winwin, Ktps, Yusen, Cello by Hast, PIL, CIMC,Evergreen and HLA.
MOL,Smart by SITC, Modern, YJC(Sinokor), MSC depot.
SCS 1 Layout 3 errors proofing processes : Gate in , M&R(2 QC layers) and Gate out. Visualized sorting processes : Using color stickers/chalks.
SCS 1 Layout Opposite Side
25,000 sq.m
Inspection
Repairing • 3,200 m2 is reserved for repairing containers. • More than 200 TEU can be repaired daily • We have our labor deployed for repairing to control the quality. (There are pros and cons using sub-contractor)
9/20/2021
S.C.S.Yard Co.,Ltd.
Truck turn around time
Issues • Truck queue issues. • 4-5 hours to get containers • Consignor Consignee and transporter headache.
Why are we fast ? • We open OT fixing boxes enruing readiness for tomorrow pick up. • OT 12:00 PM for seamless ops. • Depot management – 3-4 stacks less time to get – Grade and customer zoning – One way traffic management
Equipments •
2 Mobile Cranes
•
7 stackers
•
6 forklifts
Our equipment is more than enough Equipment breakdown is preventable but unavoidable Always have spare when equipment break down
Trucking capabilities •
10 units of 6W trailer carrying 35 tons – Truck+Chassis = 10.5 tons – Max Load+Container= 20+4 tons – Suitable for Electronic, auto parts, tire
•
10 of units 10W Trailer carrying 45 tons – Truck+Chassis 14 tons – Max Load+Container = 25+4 tons – Suitable for heavy load, commodity, steel and bulk ect. ✓ ✓ ✓ ✓
•
Most trucks age are less than 7 years old. Truck are well maintenance by our specialists to ensure breakdown All trucks have GPS installed All drivers have mobile phones and most have lines.
30 units of subcontractors
Exceptional management Customers Issues Customers need within 40-50 km radius repair we reach within 1-1.5 hour
• In case of container not meet criteria • Long wait causing machine and labor OT at factory
Our solution • 3 mobile pick up trucks with repairing equipments and PPE • We get there relatively fast other may take 3-4 hours until the container get fixed.
Why SCS? • Close location to the port help save $$$ on empty repo.
• Over 20 years experience of container handling and repair. • Understand and able to cater CMA requirements • Known for fast turnaround time and minimized queue time. • Reputation for minimum defect release benchmark with other depots.
Our Valued Customers
9/20/2021
S.C.S.Yard Co.,Ltd.
Previous Customers
9/20/2021
MAERSK
NEL
CSA
Hanjin
APL
S.C.S.Yard Co.,Ltd.
Appendix
Stacking Areas at S.C.S Yard 1
9/20/2021
S.C.S.Yard Co.,Ltd.
Workers with high experience
9/20/2021
S.C.S.Yard Co.,Ltd.
Outside Services • Inspect In/Out Gates at MOL Container Center (MCCT) • Repair containers at MCCT
9/20/2021
S.C.S.Yard Co.,Ltd.
Workers with high experience
9/20/2021
S.C.S.Yard Co.,Ltd.
Equipments • 2 Mobile Cranes •
7 stackers
•
6 forklifts
9/20/2021
S.C.S.Yard Co.,Ltd.
THANK YOU FOR YOUR TIME