E2E Magazine #4 - December 2022 Flipbook PDF


48 downloads 115 Views 6MB Size

Recommend Stories


Sunday, December 4, Food Pantry
PARISH MISSION STATEMENT: We, the people of St. Vincent de Paul Church, see ourselves as a congregation of believers in whom Jesus is living; and to d

Magazine Institucional
Magazine Institucional Agosto 2013 Laboratorios LAFEDAR Magazine Institucional INDICE 3 04 Editorial 06 Novedades 06 Lanzamiento tecnicatura 10

Magazine Institucional
Magazine Institucional Enero 2015 Laboratorios LAFEDAR Magazine Institucional INDICE 3 04 Editorial 06 06 08 10 Destacados Premio Senado de la

Proyecto de Empresario a Emprendedor - E2E 2011
Proyecto de Empresario a Emprendedor - E2E 2011 Promueven: Financia: Proyecto de Empresario a Emprendedor - E2E 2011 Promueven: Financia: Proy

Story Transcript

E2E

#4 2022

I N T E R N AT I O N A L

HELIOS EXECUTIVE DASHBOARD

Rolled out the new KPI’s homepage to have all at the same place

MFC WORKSHOP

IN CHILE

Virtual Workshop with Chile & Int’l SC team for MFC to define scope and needed integrations.

IBP (PIER)

BEGINS IN CA

Canada already began the journey of Integrated Planning Tool: PIER adopting flow forecast in the local process.

2022 Metric Progress Main Business value drivers with AOP Goals

.01

OTIF

Liable Inventory

Instock

OSA

Forecast Accuracy

DOH

wmlink/dd-intl

2022 Metric Progress

Global KPI YTD December Results

* Africa values are November YTD

.02

wmlink/e2e-intl

Pillars Update

Delivered Next Month

Big milestones and next steps INTEGRATED

PLANNING

IMPORTS VISIBILITY

(CL) Rolled out Metis to 5 DCs (MX) Pilot supplier (Colgate) expansion for DC7471 & DC7459. (SA,CA) Enable Market view in Metis/Pier. (CL,CAM) OB Breach Mgmt. insights view. (MX) AIS will expand for Colgate at 100% of DCs.

INSIGHTS

AS A SERVICE (MX) Safety Stock SelfHealing logic customization (CA,CL) EMPO MVP2 with new Filters and email routing. (CN) Smart Fcasting CN Sam’s Go Live. (ALL) Helios OTIF & FR discrepancy fix.

.03

Defined Int’l GOT Rollout strategy. (CA) Deployed ETA predictions. Int’l GOT Rollout plan, event code map and data validation. (US) Launch GOT new UI

OMNI &

ALLOCATION (CL) Full roll out of EDF in DC6004. (CN) PI Timing Update (January 11th) (MX) MCC Pilot Roll out.

wmlink/e2e-intl

Get in touch

Social

© Copyright 2013 - 2024 MYDOKUMENT.COM - All rights reserved.